Solved question paper for IE Dec-2017 (DIPLOMA civil enginerring 4th)

Irrigation engineering

Previous year question paper with solutions for Irrigation engineering Dec-2017

Our website provides solved previous year question paper for Irrigation engineering Dec-2017. Doing preparation from the previous year question paper helps you to get good marks in exams. From our IE question paper bank, students can download solved previous year question paper. The solutions to these previous year question paper are very easy to understand.

These Questions are downloaded from www.brpaper.com You can also download previous years question papers of 10th and 12th (PSEB & CBSE), B-Tech, Diploma, BBA, BCA, MBA, MCA, M-Tech, PGDCA, B-Com, BSc-IT, MSC-IT.

Print this page

Question paper 1

  1. SECTION-A

    Q1. a) Fill in the blanks.

    i. Sprinkler irrigation is also known as __________.

    Answer:

  2. Read more
  3. ii. Location of centre line of canal on ground is __________.

    Answer:

  4. Read more
  5. iii. A canal is lined to reduce ___________ loss.

    Answer:

  6. Read more
  7. iv. Soil of full depth and unit width defines ___________.

    Answer:

  8. Read more
  9. v. ________ is hydraulic structure constructed across river to store water at U/S.

    Answer:

  10. Read more
  11. vi. The process of artificially supplying water to soil for raising crops is termed _____________.

    Answer:

  12. Read more
  13. vii. 1 st watering to crop is called ____________.

    Answer:

  14. Read more
  15. viii. Delta is equal to ____________.

    Answer:

  16. Read more
  17. ix. Runoff is measured in ___________.

    Answer:

  18. Read more
  19. x. The science which deals with occurrence, circulation and distribution of water on earth is called__________.

    Answer:

  20. Read more
  21. b) State true or false.

    xi. Silting of reservoir makes the dam weak.

    Answer:

  22. xii. Drip irrigation is better than flow irrigation.

    Answer:

  23. xiii. Spillway is provided inside the body of dam.

    Answer:

  24. xiv. The bed of canal is lowered in case of super passage.

    Answer:

  25. xv. Motel layer is pervious.

    Answer:

  26. SECTION-B

    Q2. Attempt any six questions.

    a. Explain the different uses of hydrology in irrigation engineering.

    Answer:

  27. Read more
  28. b. Establish a relationship between duty, delta and base period.

    Answer:

  29. Read more
  30. c. What are the ill effects of irrigation?

    Answer:

  31. Read more
  32. d. What is necessity of canal lining and its suitability?

    Answer:

  33. Read more
  34. e. What is difference between sprinkler irrigation and drip irrigation?

    Answer:

  35. Read more
  36. f. What are causes of failure of earth dams?

    Answer:

  37. Read more
  38. g. Define the terms:- i) Aquifer ii) Aquaclude

    Answer:

  39. h. What are causes of canal beach?

    Answer:

  40. Read more
  41. SECTION-C

    Q3. Attempt any three questions.

    i. Explain the various types of river training works and their functions.

    Answer:

  42. Read more
  43. ii. Explain various types of rain gauges in detail with the help of sketches

    Answer:

  44. Read more
  45. iii. Give the advantages and disadvantages of gravity dams, also the labeled cross section of gravity dam.

    Answer:

  46. Read more
  47. iv. Describe the advantages and disadvantages of well irrigation.

    Answer:

  48. Read more