Solved question paper for HE May-2018 (DIPLOMA civil enginerring 5th)

Highway engineering

Previous year question paper with solutions for Highway engineering May-2018

Our website provides solved previous year question paper for Highway engineering May-2018. Doing preparation from the previous year question paper helps you to get good marks in exams. From our HE question paper bank, students can download solved previous year question paper. The solutions to these previous year question paper are very easy to understand.

These Questions are downloaded from www.brpaper.com You can also download previous years question papers of 10th and 12th (PSEB & CBSE), B-Tech, Diploma, BBA, BCA, MBA, MCA, M-Tech, PGDCA, B-Com, BSc-IT, MSC-IT.

Print this page

Question paper 1

  1. SECTION-A

    Q1. a) Fill in the blanks.

    i. NHAI is under the control of ________.

    Answer:

  2. ii. Bitumen containing mineral matter is known as _________.

    Answer:

  3. Read more
  4. iii. Road side development is termed as___________

    Answer:

  5. Read more
  6. iv. The stone wall constructed to protect the hill slope is __________.

    Answer:

  7. Read more
  8. v. The first stage of route selection is __________.

    Answer:

  9. Read more
  10. vi. Crushed rock is a _________ road aggregate.

    Answer:

  11. vii. _________ Map shows the contours of the area.

    Answer:

  12. Read more
  13. viii. MOST signifies__________.

    Answer:

  14. Read more
  15. ix. WBM road is an example of___________.

    Answer:

  16. x. Compaction of concrete pavements is done by _________.

    Answer:

  17. b) State True or False

    xi. Reconnaissance is also referred as “Recci”.

    Answer:

  18. xii. The maximum allowable super elevation is seven percent in plain area.

    Answer:

  19. xiii. Cutbacks can be used without heating.

    Answer:

  20. xiv. Gradient should always be greater than camber.

    Answer:

  21. xv. Landslide is one of the major problems of hill roads.

    Answer:

  22. SECTION-B

    Q2. Attempt any six questions.

    a. What are different causes of failure of bitumen roads?

    Answer:

  23. Read more
  24. b. What is the necessity of road drainage?

    Answer:

  25. Read more
  26. c. Explain stopping sight & passing sight distance.

    Answer:

  27. Read more
  28. d. Explain the importance of soil stabilization.

    Answer:

  29. Read more
  30. e. Explain the functions of IRC

    Answer:

  31. Read more
  32. f. What is Super elevation & why it is provided?

    Answer:

  33. Read more
  34. g. Differentiate between breast wall & retaining wall

    Answer:

  35. Read more
  36. h. What is sub grade & what are its functions?

    Answer:

  37. Read more
  38. SECTION-C

    Q3. Attempt any three questions.

    i. Explain with sketches, various methods of drainage of a hill road

    Answer:

  39. Read more
  40. ii. What is land slide? Give causes, prevention & control measures of landslides

    Answer:

  41. Read more
  42. iii. Define soil erosion. What are the important methods to control soil erosion?

    Answer:

  43. Read more
  44. iv. Explain various defects & their remedial measures in a rigid pavement.

    Answer:

  45. Read more
  46. v. Explain soundness test with neat sketch

    Answer:

  47. Read more