Our website provides solved previous year question paper for Construction management and accounts Dec-2018. Doing preparation from the previous year question paper helps you to get good marks in exams. From our CMA question paper bank, students can download solved previous year question paper. The solutions to these previous year question paper are very easy to understand.
These Questions are downloaded from www.brpaper.com You can also download previous years question papers of 10th and 12th (PSEB & CBSE), B-Tech, Diploma, BBA, BCA, MBA, MCA, M-Tech, PGDCA, B-Com, BSc-IT, MSC-IT.
Question paper 1
SECTION-A
Q1. Do as directed.
a. ______ is the ultimate objective of a design?
Answer:
Read moreb. Construction of residential building is an example of _______
Answer:
Read morec. ______ Schedule is used to prepare labour and material schedule.
Answer:
Read mored. Activity oriented network is ________
Answer:
Read moree. A chart which gives hierarchy of employees is termed as _____
Answer:
Read moref. Event is also termed as ________
Answer:
Read moreg. ________should be installed at the construction site to prevent fire hazards
Answer:
Read moreh. The plan of systematic arrangements for temporary service at _______
Answer:
Read morei. The construction project is carried out in the form of _______
Answer:
Read morek. The inspection of construction work can be done by any person. (T/F)
Answer:
l. Accident rate can be reduced by safety education. (T/F)
Answer:
m. D.F.R is an important book dealing with accounts. (T/F)
Answer:
n. Major works are entered in work abstract “B” (T/F)
Answer:
o. Administration approval is the final sanction of work. (T/F)
Answer:
SECTION-B
Q2. Attempt any six questions.
i. What is the significance of construction management?
Answer:
ii. Define contract.
Answer:
iii. What is the muster roll?
Answer:
iv. Distinguish between cash book and ledger.
Answer:
Read morev. Define various reference books on PWD accounts
Answer:
Read morevi. Define line organization.
Answer:
vii. What points you will keep in mind during inspection of building work
Answer:
viii. Differentiate between PERT and CPM.
Answer:
Read moreSECTION-C
Attempt any three questions.
Q3. a) Differentiate between technical sanction and administrative approval.
Answer:
Read moreb) What are the limitations of bar charts?
Answer:
Read moreQ4. a) What is meant by construction Planning?
b) What is difference between direct and indirect cost?
Answer:
Q5. a) What is difference between SMB and OMB?
b) Enlist the important stages of inspection in construction work.
Answer:
Q6. a) What is the need for safety measure?
b) What are the functions of owners in construction team?
Answer: