Our website provides solved previous year question paper for Quantity surveying and valuation Dec-2018. Doing preparation from the previous year question paper helps you to get good marks in exams. From our QSV question paper bank, students can download solved previous year question paper. The solutions to these previous year question paper are very easy to understand.
These Questions are downloaded from www.brpaper.com You can also download previous years question papers of 10th and 12th (PSEB & CBSE), B-Tech, Diploma, BBA, BCA, MBA, MCA, M-Tech, PGDCA, B-Com, BSc-IT, MSC-IT.
Question paper 1
SECTION-A
Q1. State the Units of Measurement for the following items of Work.
a. Concrete
Answer:
b. Brick Work
Answer:
c. Earth Work
Answer:
d. Cement Plaster
Answer:
e. Steel Work
Answer:
f. Cement Drip Course
Answer:
g. D.P.C
Answer:
h. Flooring
Answer:
i. Skirting
Answer:
j. White Washing
Answer:
Q2. Fill in the blanks.
i. No. of bricks for 1 cu.m Brick Masonry is ________.
Answer:
ii. One Bag of Cement = _______ cu.m
Answer:
iii. The Attendance of Laborers’ is recorded daily in _______.
Answer:
iv. The Amount submitted by Contractor as the guarantee of Tender is called ________.
Answer:
v. The Loss in the value of Property due to structural deterioration is called ________.
Answer:
SECTION-B
Q3. Attempt any five questions.
a. Find out the Dry Materials required for 1 cu.m Brick Masonry in Cement Mortar 1:5.
Answer:
b. Find out the Dry Materials required for 10 sq.m Cement Plaster 1:4 (1.25 cm thick).
Answer:
c. Find out the Dry Materials required for 1 cu.m Cement Concrete 1:2:4
Answer:
d. What is Valuation? Write down the purpose of Valuation.
Answer:
Read moree. Define Tender. Write the names of various Tender Documents.
Answer:
Read moref. Write a short note on Depreciation of Buildings and different types of Building Estimates.
Answer:
g. Define the following terms:
1. Earnest Money 2. Administrative Approval.
Answer:
h. Write a short note on Muster Role and Lump Sum Contract
Answer:
Read moreSECTION-C
Attempt any three Questions. 10x3=30 Q4. A short Link Road to be constructed entirely in Cutting at a uniform rising gradient 1 in 30, the NSL is given below:
R.D(m) NSL(m) 0 70.50 30 69.30 60 71.40 90 74.00 120 75.10 150 76.10 If the Formation Level at RD 0 is 75.00 metre, Estimate the Quantity of Cutting for the Formation Width of 10 m. The Side Slope is 2:1 and there is no cross-slope. Also find out the Cost of Cutting @ Rs. 450 % cu.m.
Answer:
Q5. Prepare the Analysis of Rate for 10 cu.m of Cement Concrete 1:2:4 from the following data:
Labour for 10 cu.m : Mason: 1 no. @Rs. 300 per day
Labour: 15 no. @Rs. 200 per day
Water Man: 2 no. @ Rs. 250 per day
Cost of Material Cement: Rs. 300 per Bag
Sand: Rs. 600 per cu.m
Bajri: Rs. 1200 per cu.m.
Answer:
Q6. Define Contract and explain its different types
Answer:
Q7. Explain the following terms:
a. Sinking Fund
b. Scrap Value
c. Capital Cost
d. Gross Income
e. Year Purchase
Answer:
Q8. Explain in detail the various methods of Valuation
Answer: