System Analysis and Design for Punjab State Board of Technical Education Diploma in Engineering, Computer Engineering 3rd semester is a subject page where students can find subject-wise previous year question papers and old papers for exam preparation. It helps with revision by showing the kind of questions asked, the format of the paper, and the areas that are repeated more often in exams. BRpaper is not the official website of Punjab State Board of Technical Education. This page is meant to help students quickly access System Analysis and Design question papers for practice, understand exam patterns, and prepare with a focused approach.

Solved Questions

Solved
  1. Surveying is the art of determining _____ of objects on the surface of earth.
    Fill in the Blanks 1 Marks May-2018 • PSBTE DIPLOMA
  2. The part of surveying which deals with measurement in the vertical plane is known as ____.
    Fill in the Blanks 1 Marks May-2018 • PSBTE DIPLOMA
  3. The survey where curvature of earth is taken into consideration is known as _____.
    Fill in the Blanks 1 Marks May-2018 • PSBTE DIPLOMA
  4. Least count of leveling staff is _____.
    Fill in the Blanks 1 Marks May-2018 • PSBTE DIPLOMA
  5. Ranging rod more than 4m less than 6m. Is _____.
    Fill in the Blanks 1 Marks May-2018 • PSBTE DIPLOMA
  6. WCB of a line is 2200 RB is _____.
    Fill in the Blanks 1 Marks May-2018 • PSBTE DIPLOMA
  7. Magnetic dip at pole is _____.
    Fill in the Blanks 1 Marks May-2018 • PSBTE DIPLOMA
  8. With Prismatic compass we find ____ bearing.
    Fill in the Blanks 1 Marks May-2018 • PSBTE DIPLOMA
  9. In plane table surveying _____ are eliminated.
    Fill in the Blanks 1 Marks May-2018 • PSBTE DIPLOMA
  10. Multiplying constant of level is _____.
    Fill in the Blanks 1 Marks May-2018 • PSBTE DIPLOMA
  11. Magnetic dip at equator is 00.
    True / False 1 Marks May-2018 • PSBTE DIPLOMA
  12. Area less than 100 square mile we go in for plane surveying .
    True / False 1 Marks May-2018 • PSBTE DIPLOMA
  13. Temporary adjustment involves centering, leveling and focusing.
    True / False 1 Marks May-2018 • PSBTE DIPLOMA
  14. In chain surveying field notes are prepared.
    True / False 1 Marks May-2018 • PSBTE DIPLOMA
  15. From a distance place we shift the RL by fly leveling.
    True / False 1 Marks May-2018 • PSBTE DIPLOMA
  16. From a distance place w e shift the RL by fly leveling.
    True / False 1 Marks May-2018 • PSBTE DIPLOMA
  17. Explain main division of surveying.
    Short Answer 6 Marks May-2018 • PSBTE DIPLOMA
  18. Explain indirect ranging across hill.
    Short Answer 6 Marks May-2018 • PSBTE DIPLOMA
  19. How you will set perpendicular offset by brass cross staff ?
    Short Answer 6 Marks May-2018 • PSBTE DIPLOMA
  20. How you will find angles meeting at a point by prismatic compass?
    Short Answer 6 Marks May-2018 • PSBTE DIPLOMA
  21. Explain check leveling.
    Short Answer 6 Marks May-2018 • PSBTE DIPLOMA
  22. Explain radiation method of plane table surveying.
    Short Answer 6 Marks May-2018 • PSBTE DIPLOMA
  23. Explain temporary adjustment of dummy level.
    Short Answer 6 Marks May-2018 • PSBTE DIPLOMA
  24. Write a short note on prismatic compass.
    Short Answer 6 Marks May-2018 • PSBTE DIPLOMA
  25. Discuss difficulties in leveling.
    Short Answer 6 Marks May-2018 • PSBTE DIPLOMA
  26. Explain inter - section method of plane table surveying.
    Long Answer 10 Marks May-2018 • PSBTE DIPLOMA
  27. The followings consecutive readings were taken with the help of a Dumpy level : 1.904, 2.653, 3.906, 4.026, 1.964, 1.702, 1.592, 1.261, 2.542, 2.006, 3.145. The instrument was shifted after the 4th and 7th reading The first reading was taken on the staff held on the bench mark 100.000 m. Calculate RLs of all points. Apply check also.
    Long Answer 10 Marks May-2018 • PSBTE DIPLOMA
  28. A 20 m. Chain was found to be 6 cm. To long after chaining a distance of 3800 m. It was tested again at the end of day’s work and found to be 9 cm . Too long after chaining a total distance of 7000m. If the chain was correct before commencement of the work. Find the true length.
    Long Answer 10 Marks May-2018 • PSBTE DIPLOMA
  29. Explain indirect ranging across valley.
    Long Answer 10 Marks May-2018 • PSBTE DIPLOMA
  30. Explain method fly leveling to shift RL from a distance place .
    Long Answer 10 Marks May-2018 • PSBTE DIPLOMA

Explore all data

FAQ

Frequently Asked Questions

Answers about this subject, solved papers, and preparation.

Updated regularly
01 Where can I find System Analysis and Design previous year question papers for PSBTE Diploma Computer Engineering 3rd semester?

This page is meant to help students find subject-wise previous year and old question papers for System Analysis and Design in PSBTE Diploma Computer Engineering 3rd semester.

02 Are the question papers available subject-wise for this semester?

Yes, this subject page is organized for System Analysis and Design so students can check papers relevant to this exact subject and semester.

03 Can I download the System Analysis and Design papers in PDF format?

Many students look for PDF question papers, and this page is intended to help with access to previous year papers in a study-friendly format when available.

04 Does BRpaper provide solved papers or answers for System Analysis and Design?

BRpaper focuses on previous year and old question papers. It does not claim to provide official solved papers or complete answer keys.

05 How do previous year papers help in exam preparation for SAD?

They help students understand the exam pattern, identify repeated topics, and practice the type of questions commonly asked in System Analysis and Design.