Solved question paper for BC Dec-2007 (DIPLOMA 3rd)

Solved Question Paper

Building construction Dec-2007

PSBTE • DIPLOMA • Cvil Engineering • 3rd • Dec-2007

BC for Punjab State Board of Technical Education Diploma in Engineering Civil Engineering 3rd semester helps students find subject-wise previous year question papers for building construction. These papers are useful for revision, understanding the exam pattern, and spotting repeated topics before exams. Students can use old papers to practice important questions and get a better idea of how building construction questions are framed in diploma exams. BRpaper is not the official website of Punjab State Board of Technical Education or any board, university, or institute. It only helps students access previous year papers and exam preparation material in one place for easier study and quick review.

Solved Questions

Solved
  1. Grillage foundation is classified as a ______ foundation.
    Fill in the Blanks 1 Marks Dec-2007 • PSBTE DIPLOMA
  2. The stone which extends through the entire thickness of a stone masonry wall is called ______.
    Fill in the Blanks 1 Marks Dec-2007 • PSBTE DIPLOMA
  3. The mortar in which both cement and lime are used as binding materials is called ______ mortar.
    Fill in the Blanks 1 Marks Dec-2007 • PSBTE DIPLOMA
  4. The thickness of cement concrete in a horizontal D.P.C. is generally kept ______.
    Fill in the Blanks 1 Marks Dec-2007 • PSBTE DIPLOMA
  5. The projections of the head of a door or window frame, embedded in the masonry, are called ______.
    Fill in the Blanks 1 Marks Dec-2007 • PSBTE DIPLOMA
  6. The roof which slopes in four directions is called a ______ roof.
    Fill in the Blanks 1 Marks Dec-2007 • PSBTE DIPLOMA
  7. The building with ground floor and first floor is called a ______ building.
    Fill in the Blanks 1 Marks Dec-2007 • PSBTE DIPLOMA
  8. Rise is the vertical distance between two adjacent ______ in a staircase.
    Fill in the Blanks 1 Marks Dec-2007 • PSBTE DIPLOMA
  9. The process of filling the hollow spaces in a solid background of a wall before the application of plaster is termed as ______.
    Fill in the Blanks 1 Marks Dec-2007 • PSBTE DIPLOMA
  10. Building planning must be taken care of before its ______.
    Fill in the Blanks 1 Marks Dec-2007 • PSBTE DIPLOMA
  11. What is the requirement of a good residential building?
    Short Answer 3 Marks Dec-2007 • PSBTE DIPLOMA
  12. Why should the bricks be laid with their frog upward?
    Short Answer 3 Marks Dec-2007 • PSBTE DIPLOMA
  13. Why are composite masonry walls constructed?
    Short Answer 3 Marks Dec-2007 • PSBTE DIPLOMA
  14. Why is steel tubular scaffolding preferred to timber scaffolding?
    Short Answer 3 Marks Dec-2007 • PSBTE DIPLOMA
  15. Give the list of steel fastenings used for a single-leafed door.
    Short Answer 3 Marks Dec-2007 • PSBTE DIPLOMA
  16. Requirements of a good stair.
    Short Answer 5 Marks Dec-2007 • PSBTE DIPLOMA
  17. General specifications and laying procedure for 40 mm thick conglomerate floor.
    Short Answer 5 Marks Dec-2007 • PSBTE DIPLOMA
  18. Different types of pointing with brief description of each.
    Short Answer 5 Marks Dec-2007 • PSBTE DIPLOMA
  19. Merits and demerits of using metal doors and windows in high rise buildings.
    Short Answer 5 Marks Dec-2007 • PSBTE DIPLOMA
  20. Factors affecting building planning.
    Short Answer 5 Marks Dec-2007 • PSBTE DIPLOMA
  21. Explain various methods of bonding new brick work with old brick work.
    Long Answer 10 Marks Dec-2007 • PSBTE DIPLOMA
  22. State general principles to be observed in the construction of stone masonry.
    Long Answer 10 Marks Dec-2007 • PSBTE DIPLOMA
  23. Describe the various methods of preventing dampness in a building.
    Long Answer 10 Marks Dec-2007 • PSBTE DIPLOMA
  24. Give the characteristics and functions of sand and surkhi in mortars.
    Long Answer 10 Marks Dec-2007 • PSBTE DIPLOMA
  25. What is the difference between scaffolding and centering? Explain with the help of sketches.
    Long Answer 10 Marks Dec-2007 • PSBTE DIPLOMA
  26. When and where are the following arches used: (i) Inverted arch (ii) Relieving arch
    Long Answer 10 Marks Dec-2007 • PSBTE DIPLOMA
  27. What are flush doors? Give their merits and demerits.
    Long Answer 10 Marks Dec-2007 • PSBTE DIPLOMA
  28. State under what circumstances you will recommend the following: (i) A pitched roof (ii) A flat roof
    Long Answer 10 Marks Dec-2007 • PSBTE DIPLOMA

Explore all data

FAQ

Frequently Asked Questions

Answers about this subject, solved papers, and preparation.

Updated regularly
01 Where can I find BC previous year question papers for PSBTE Diploma Civil Engineering 3rd semester?

You can use this BC subject page to find previous year question papers for Building Construction in the PSBTE Diploma Civil Engineering 3rd semester.

02 Are these BC papers useful for exam preparation?

Yes, old BC papers help with revision, repeated questions, and understanding the usual exam pattern for diploma civil students.

03 Do these pages include solved BC question papers?

This page is for previous year question papers and related preparation material. Solved papers may not be available unless shown on the page.

04 Can I use BC old papers to identify important topics?

Yes, reviewing older Building Construction papers can help you spot commonly asked topics and prepare more focused revision notes.

05 Are the BC papers available in PDF format?

Availability can vary by paper set, but the page is designed to help students access and read previous year papers in a convenient format.