Solved question paper for SUR-1 May-2018 (DIPLOMA 3rd)
Solved Question Paper
Surveying-1 May-2018
PSBTE • DIPLOMA • Cvil Engineering • 3rd • May-2018
SUR-1 for Punjab State Board of Technical Education Diploma in Engineering is the subject page where students can find subject-wise previous year question papers for Surveying-1 in the 3rd semester of Civil Engineering. These old papers help with revision, repeated questions, and understanding the exam pattern before the exam. Use this page to practice with Civil Engineering semester papers, review commonly asked topics, and prepare more confidently. BRpaper is not the official website of the Punjab State Board of Technical Education or any university or board, but it helps students access previous year papers and exam preparation material in one place.
Solved Questions
Solved-
SECTION-A
Q1. a) Fill in the blanks.
i. Surveying is the art of determining _______ of objects on the surface of earth.
Very Short Answer 15x1=15 Marks May-2018 • PSBTE DIPLOMA-
Dec 2017
SECTION-A
Q1. a) Fill in the blanks.
i. Surveying is the art of determining the-------- of objects on earth surface.
-
-
The part of surveying which deals with measurement in the vertical plane is known as___.
Very Short Answer May-2018 • PSBTE DIPLOMA-
Dec 2005 The part of surveying which deals with measurements in the vertical plane is known as _______.
-
-
The survey where curvature of earth is taken into consideration is known as ________ .
Very Short Answer May-2018 • PSBTE DIPLOMA-
May 2022 The survey where curvature of the earth is taken into account is known as _____.
-
May 2017
The survey, where curvature of the earth is taken into account is known as…………..
-
May 2016 The survey, where curvature of the earth is taken into account is known as…………..
-
-
Least count of leveling staff is ______.
Very Short Answer May-2018 • PSBTE DIPLOMA-
May 2022 Least Count of Leveling Staff is ________.
-
Dec 2019 Least count of leveling staff is _____.
-
-
Ranging rod more than 4m less than 6m. Is ______.
Very Short Answer May-2018 • PSBTE DIPLOMA -
WCB of a line is 2200 RB is ______.
Very Short Answer May-2018 • PSBTE DIPLOMA -
Magnetic dip at pole is ________.
Very Short Answer May-2018 • PSBTE DIPLOMA-
May 2008 At poles, the magnetic dip is equal to ______.
-
-
With Prismatic compass we find _____ bearing.
Very Short Answer May-2018 • PSBTE DIPLOMA -
In plane table surveying ______ are eliminated.
Very Short Answer May-2018 • PSBTE DIPLOMA -
Multiplying constant of level is ______.
Very Short Answer May-2018 • PSBTE DIPLOMA -
State True or False.
xi. Magnetic dip at equator is 00.
Very Short Answer May-2018 • PSBTE DIPLOMA -
Area less than 100 square mile we go in for plane surveying .
Very Short Answer May-2018 • PSBTE DIPLOMA -
Temporary adjustment involves centering, leveling and focusing.
Very Short Answer May-2018 • PSBTE DIPLOMA -
In chain surveying field notes are prepared.
Very Short Answer May-2018 • PSBTE DIPLOMA -
From a distance place we shift the RL by fly leveling
Very Short Answer May-2018 • PSBTE DIPLOMA -
SECTION-B
Q2. Attempt any five questions.
a. Explain main division of surveying.
Short Answer 5x6=30 Marks May-2018 • PSBTE DIPLOMA-
May 2017
SECTION B
Q.2 Attempt any six Questions.
a. What a surveying? What for it is done?
-
Dec 2017
SECTION-B
Q2. Attempt any five questions.
a. Define Surveying, What are its basic principles?
-
-
Explain indirect ranging across hill
Short Answer May-2018 • PSBTE DIPLOMA-
May 2018
Explain indirect ranging across valley
-
-
How you will set perpendicular offset by brass cross staff ?
Short Answer May-2018 • PSBTE DIPLOMA -
How you will find angles meeting at a point by prismatic compass?
Short Answer May-2018 • PSBTE DIPLOMA -
Explain check leveling.
Short Answer May-2018 • PSBTE DIPLOMA -
Explain radiation method of plane table surveying.
Short Answer May-2018 • PSBTE DIPLOMA-
May 2021 Explain the radiation method of plane table surveying in detail with diagram.
-
Dec 2019 Explain Radiation method of Plane Table Survey.
-
Dec 2011 Explain radiation method of plain table surveying.
-
Dec 2005 Describe radiation method of plane table surveying.
-
-
Explain temporary adjustment of dumpy level.
Short Answer May-2018 • PSBTE DIPLOMA-
May 2022 Explain temporary adjustment of dumpy level.
-
May 2020 Explain the temporary adjustments of a dumpy level.
-
Dec 2019 Explain Temporary adjustments of Dumpy Level.
-
Dec 2018
Write about various temporary adjustments of Dumpy Level.
-
Dec 2017
Explain the Temporary adjustments of Dumpy Level.
-
Dec 2016 Explain temporary adjustment of a dumpy level.
-
Dec 2015 Explain the Temporary adjustments of Dumpy Level.
-
Dec 2005 List and explain temporary adjustments of a dumpy level.
-
-
Write a short note on prismatic compass.
Short Answer May-2018 • PSBTE DIPLOMA-
May 2022 Write a short note on Prismatic compass
-
-
Discuss difficulties in leveling.
Short Answer May-2018 • PSBTE DIPLOMA-
Dec 2007 What are the difficulties in leveling.
-
-
SECTION-C
Q3. Attempt any three questions.
i. Explain inter - section method of plane table surveying
Short Answer 3x10=30 Marks May-2018 • PSBTE DIPLOMA -
The followings consecutive readings were taken with the help of a Dumpy level : 1.904, 2.653, 3.906, 4.026, 1.964, 1.702, 1.592, 1.261, 2.542, 2.006, 3.145. The instrument was shifted after the 4th and 7th reading The first reading was taken on the staff held on the bench mark 100.000 m. Calculate RLs of all points. Apply check also.
Long Answer May-2018 • PSBTE DIPLOMA-
May 2022 The following consecutive readings were taken with the help of a dumpy level 1.805, 2.655, 3.905, 4.025, 1.960, 1.700, 1.595, 1.265, 2.255, 3.055, 2.590, 2.005, 3.040 the instrument was shifted after third, sixth and ninth reading. Calculate the R.L of all points by any method. The first reading was taken on the staff held on the bench mark of RL =100m.
-
May 2019 The following consecutive readings were taken with a level: 1.775, 1.835, 1.640, 0.975, 1.135, 1.545, 2.040, 2.710, 1.580, 1.435, 1.470 and 1.265. The instrument was shifted after 5th and 9th reading. Find out the RL of all the points by any method. The first reading was taken on the staff held on benchmark 200m.
-
Dec 2019 The following consecutive readings were taken with the help of a dumpy level: 1.805, 2.655, 3.905, 3.025, 1.960, 2.700, 1.595, 1.865, 2.255, 3.455, 2.590, 1.005, 3.040, 2.555. The instrument was shifted after third, sixth and ninth reading. Calculate the R.L. of all points by any method. The first reading was taken on the staff held on the Bench Mark of R.L. = 80 m.
-
May 2017
The following consecutive readings were taken with the help of a Dumpy Level:1.810, 2.110, 1.225, 1.455, 0.905, 2.435, 2.810, 2.075 and 1.765. The instrument was shifted after the fourth and seventh readings. The first reading was taken on the staff held on the B.M of R.L 100.000 metres. Calculate the R.Ls of the points and apply the arithmetical Check.
-
May 2016 The following consecutive readings were taken with the help of a Dumpy Level: 1.904, 2.653, 3.906, 4.026, 1.964, 1.702, 1.592, 1.261, 2.542, 2.006, 3.145. The instrument was shifted after the fourth and seventh readings. The first reading was taken on the staff held on the B.M of R.L 100.000 metres. Calculate the R.Ls of the points and apply the arithmetical check.
-
Dec 2016 The following consecutive readings were taken with dumpy level; 1.810, 2.110, 1.225, 1.455, 0.905, 2.435, 2.810, 2.075 and 1.765. The level was shifted after 4th and 7th reading. The first reading was taken on staff held on the bench mark of RL 50.000m. Calculate the RL of all points and apply arithmetic check.
-
-
A 20 m. Chain was found to be 6 cm. To long after chaining a distance of 3800 m. It was tested again at the end of day’s work and found to be 9 cm. Too long after chaining a total distance of 7000m. If the chain was correct before commencement of the work. Find the true length.
Long Answer May-2018 • PSBTE DIPLOMA-
May 2022 A 20m chain was found to be 6cm too long after chaining a distance of 3800m. It was tested again at the end of day’s work and found to be 9cm too long after chaining a total distance of 7000m. If the chain was correct before the commencement of the work. Find the true length h.
-
May 2022 A 30 m chain was found to be 10cm too long after chaining a distance of 4000m and 15cm too long after chaining the total distance of 8000m. If the chain was correct before the commencement of work, find the True Distance.
-
Dec 2016 A chain was found to be 60mm too long after chaining a distance of 3800m and 90mm too long after chaining a total distance of 7000m. If the chain was correct at the start of work, find the true distance.
-
Dec 2015 A 20 mt. chain was found to be 60 mm too long after chaining a distance of 3800 mt. and 90 mm too long after chaining a total distance of 7000 mm. If the chain was correct at the start of work. Find the true length.
-
-
Explain indirect ranging across valley
Long Answer May-2018 • PSBTE DIPLOMA-
May 2018
Explain indirect ranging across hill
-
-
Explain method fly leveling to shift RL from a distance place
Long Answer May-2018 • PSBTE DIPLOMA
Explore all data
FAQ
Frequently Asked Questions
Answers about this subject, solved papers, and preparation.
01 Where can I find SUR-1 Surveying-1 previous year question papers?
You can use this subject page to look for SUR-1 previous year question papers for PSBTE Diploma Civil Engineering 3rd semester.
02 Are these papers useful for revision before the exam?
Yes, old papers help you revise important topics, practice common question styles, and understand the exam pattern.
03 Does this page include solved papers?
This page is mainly for previous year question papers and exam preparation material. Solved papers may not be available for every paper.
04 Can I use these papers to check repeated questions?
Yes, previous year papers are useful for spotting repeated questions and commonly asked areas in Surveying-1.
05 Is BRpaper the official website of PSBTE?
No. BRpaper is not the official website of the Punjab State Board of Technical Education. It only helps students find previous year papers and related preparation content.