Solved question paper for CT May-2010 (DIPLOMA 4th)

Solved Question Paper

Concrete technology May-2010

PSBTE • DIPLOMA • Cvil Engineering • 4th • May-2010

CT (Concrete Technology) for Punjab State Board of Technical Education Diploma in Engineering, Civil Engineering 4th Semester helps students find subject-wise previous year question papers for revision and practice. This page is useful for checking paper patterns, repeated questions, and the style of theory exams before studying the subject. Students can use these question papers to revise faster, understand important topics, and prepare with semester-wise and year-wise practice material. BRpaper is not the official website of the university or board, and the papers here are only for study reference and exam preparation.

Solved Questions

Solved
  1. In fineness test of Ordinary Portland cement, the residue on I.S. sieve No. 9 should not be more than __________.
    Fill in the Blanks 1 Marks May-2010 • PSBTE DIPLOMA
  2. When fully saturated, the bulking of sand is __________.
    Fill in the Blanks 1 Marks May-2010 • PSBTE DIPLOMA
  3. The phenomenon by virtue of which the plastic cement paste changes into solid mass is known as __________.
    Fill in the Blanks 1 Marks May-2010 • PSBTE DIPLOMA
  4. In concrete, the only lubricant available is __________.
    Fill in the Blanks 1 Marks May-2010 • PSBTE DIPLOMA
  5. As the internal friction of aggregates increases, workability __________.
    Fill in the Blanks 1 Marks May-2010 • PSBTE DIPLOMA
  6. The ratio of various ingredients in concrete of grade M20 is __________.
    Fill in the Blanks 1 Marks May-2010 • PSBTE DIPLOMA
  7. The appearance of water on the surface of concrete after compaction is called __________.
    Fill in the Blanks 1 Marks May-2010 • PSBTE DIPLOMA
  8. The separation of coarse aggregates from cement water paste is called __________.
    Fill in the Blanks 1 Marks May-2010 • PSBTE DIPLOMA
  9. The concrete should not be placed during __________.
    Fill in the Blanks 1 Marks May-2010 • PSBTE DIPLOMA
  10. The mixing water should be chilled in very hot weather by __________.
    Fill in the Blanks 1 Marks May-2010 • PSBTE DIPLOMA
  11. Accelerators are used during hot weather.
    True / False 1 Marks May-2010 • PSBTE DIPLOMA
  12. The water cement ratio should not be kept constant.
    True / False 1 Marks May-2010 • PSBTE DIPLOMA
  13. Quantity of cement is measured by volume.
    True / False 1 Marks May-2010 • PSBTE DIPLOMA
  14. The curing rate of concrete is changed by temperature.
    True / False 1 Marks May-2010 • PSBTE DIPLOMA
  15. Harshness results in porous concrete.
    True / False 1 Marks May-2010 • PSBTE DIPLOMA
  16. Define Concrete?
    Short Answer 3 Marks May-2010 • PSBTE DIPLOMA
  17. Differentiate between ordinary concrete and controlled concrete?
    Short Answer 3 Marks May-2010 • PSBTE DIPLOMA
  18. Name the main chemical compounds present in Ordinary Portland cement?
    Short Answer 3 Marks May-2010 • PSBTE DIPLOMA
  19. What do you understand by setting and hardening of cement?
    Short Answer 3 Marks May-2010 • PSBTE DIPLOMA
  20. Differentiate between volume batching and weight batching?
    Short Answer 3 Marks May-2010 • PSBTE DIPLOMA
  21. What is the effect of gypsum on setting time?
    Short Answer 3 Marks May-2010 • PSBTE DIPLOMA
  22. What do you mean by segregation?
    Short Answer 3 Marks May-2010 • PSBTE DIPLOMA
  23. Why concrete should be workable?
    Short Answer 3 Marks May-2010 • PSBTE DIPLOMA
  24. Differentiate between accelerators and retarders in concrete?
    Short Answer 3 Marks May-2010 • PSBTE DIPLOMA
  25. Why cement should not be allowed to come in moisture contact?
    Short Answer 3 Marks May-2010 • PSBTE DIPLOMA
  26. Differentiate between initial setting and final setting of cement?
    Short Answer 3 Marks May-2010 • PSBTE DIPLOMA
  27. Why slump test is performed?
    Short Answer 3 Marks May-2010 • PSBTE DIPLOMA
  28. Define workability of concrete? Explain the various factors affecting workability.
    Long Answer 10 Marks May-2010 • PSBTE DIPLOMA
  29. Define curing? Explain the various methods of curing.
    Long Answer 10 Marks May-2010 • PSBTE DIPLOMA
  30. Describe slump test for concrete? What are the limitations of this test?
    Long Answer 10 Marks May-2010 • PSBTE DIPLOMA
  31. Discuss various precautions required for hot weather concreting?
    Long Answer 10 Marks May-2010 • PSBTE DIPLOMA

Explore all data

FAQ

Frequently Asked Questions

Answers about this subject, solved papers, and preparation.

Updated regularly
01 Where can I find CT previous year question papers for 4th semester civil diploma?

You can use this page to find CT (Concrete Technology) previous year question papers for PSBTE Diploma in Engineering Civil Engineering 4th semester in one place.

02 Are subject-wise question papers available for CT?

Yes, this page is meant to help students locate subject-wise CT question papers for revision and exam preparation.

03 Can I download CT question papers in PDF format?

If PDF files are available on the page, you can use them for practice and revision. Availability may vary by paper and year.

04 Do these papers help with exam pattern and repeated questions?

Yes, previous year papers are useful for understanding the exam pattern, question style, and topics that are often repeated in exams.

05 Are solved question papers available here?

This page focuses on previous year question papers for study reference. Solved papers or answer keys may not be available for every paper.