Solved question paper for IE May-2016 (DIPLOMA 4th)

Solved Question Paper

Irrigation engineering May-2016

PSBTE • DIPLOMA • Cvil Engineering • 4th • May-2016

Irrigation Engineering for Punjab State Board of Technical Education Diploma in Engineering students on this page is presented to help you find subject-wise previous year question papers, old question papers, and exam preparation material for the 4th semester Civil Engineering stream. It can be useful for revision, practising important questions, and understanding the exam pattern before appearing in the paper. BRpaper is not the official website of Punjab State Board of Technical Education. This page is meant for students looking for semester-wise and subject-wise question paper access for Irrigation Engineering, so they can study with a better sense of repeated topics and paper style.

Solved Questions

Solved
  1. Irrigation scheme in ______ areas are generally constructed as protective scheme.
    Fill in the Blanks 1 Marks May-2016 • PSBTE DIPLOMA
  2. The crop which requires the most water is ______.
    Fill in the Blanks 1 Marks May-2016 • PSBTE DIPLOMA
  3. A ______ is a graph showing variation of discharge with time.
    Fill in the Blanks 1 Marks May-2016 • PSBTE DIPLOMA
  4. In perennial irrigation ______ is constructed for storing water on upstream side.
    Fill in the Blanks 1 Marks May-2016 • PSBTE DIPLOMA
  5. Excess earth excavated from canal section is disposed off in ______.
    Fill in the Blanks 1 Marks May-2016 • PSBTE DIPLOMA
  6. Gap created in the bank of canal is called ______.
    Fill in the Blanks 1 Marks May-2016 • PSBTE DIPLOMA
  7. Aquifers are ______ formation of underground soil.
    Fill in the Blanks 1 Marks May-2016 • PSBTE DIPLOMA
  8. Overflow spillway is also called ______ spillway.
    Fill in the Blanks 1 Marks May-2016 • PSBTE DIPLOMA
  9. Silt excluding device located in the canal at a distance downstream from head of canal is ______.
    Fill in the Blanks 1 Marks May-2016 • PSBTE DIPLOMA
  10. Canal should be aligned along water shed in order to reduce the number of ______ works.
    Fill in the Blanks 1 Marks May-2016 • PSBTE DIPLOMA
  11. Maize is rabi crop.
    True / False 1 Marks May-2016 • PSBTE DIPLOMA
  12. Float type rain gauge is also called siphon rain gauge.
    True / False 1 Marks May-2016 • PSBTE DIPLOMA
  13. The diameter of casing pipe is kept less than that of tube well.
    True / False 1 Marks May-2016 • PSBTE DIPLOMA
  14. Borrow pits can be dug on berms for providing earth.
    True / False 1 Marks May-2016 • PSBTE DIPLOMA
  15. In the presence of energy dissipaters, large scale scour can take place.
    True / False 1 Marks May-2016 • PSBTE DIPLOMA
  16. Give ill effects of irrigation.
    Short Answer 5 Marks May-2016 • PSBTE DIPLOMA
  17. What are the advantages of crop rotation?
    Short Answer 5 Marks May-2016 • PSBTE DIPLOMA
  18. What are the advantages of drip irrigation?
    Short Answer 5 Marks May-2016 • PSBTE DIPLOMA
  19. What are the advantages of brick lining of canal?
    Short Answer 5 Marks May-2016 • PSBTE DIPLOMA
  20. What are the advantages of gravity dams?
    Short Answer 5 Marks May-2016 • PSBTE DIPLOMA
  21. Differentiate between weir and barrage.
    Short Answer 5 Marks May-2016 • PSBTE DIPLOMA
  22. What is pitched island?
    Short Answer 5 Marks May-2016 • PSBTE DIPLOMA
  23. What is cut-off?
    Short Answer 5 Marks May-2016 • PSBTE DIPLOMA
  24. What are the functions of river training works?
    Short Answer 5 Marks May-2016 • PSBTE DIPLOMA
  25. What are the functions of guide bank?
    Short Answer 5 Marks May-2016 • PSBTE DIPLOMA
  26. What are the advantages and disadvantages of automatic rain gauge?
    Short Answer 5 Marks May-2016 • PSBTE DIPLOMA
  27. Discuss in detail the methods of improving duty of canal water.
    Long Answer 10 Marks May-2016 • PSBTE DIPLOMA
  28. Compare sprinkler irrigation with drip irrigation.
    Long Answer 10 Marks May-2016 • PSBTE DIPLOMA
  29. What are the remedial measures for prevention of water logging?
    Long Answer 10 Marks May-2016 • PSBTE DIPLOMA
  30. Describe the various factors affecting the canal alignment.
    Long Answer 10 Marks May-2016 • PSBTE DIPLOMA
  31. What is canal breach? What are their causes?
    Long Answer 10 Marks May-2016 • PSBTE DIPLOMA

Explore all data

FAQ

Frequently Asked Questions

Answers about this subject, solved papers, and preparation.

Updated regularly
01 Where can I find Irrigation Engineering previous year question papers for PSBTE Diploma?

This page is meant to help PSBTE Diploma in Engineering Civil students find Irrigation Engineering previous year question papers in one place for revision and practice.

02 Are subject-wise question papers available for the 4th semester Civil Engineering stream?

Yes, this subject page is focused on Irrigation Engineering for the 4th semester Civil Engineering stream, so students can look for subject-wise papers more easily.

03 Can I use these papers for PDF download and revision?

The page is intended for question paper discovery and revision support, including papers students commonly look for in PDF format when preparing for exams.

04 Do these question papers include solved answers?

BRpaper does not claim to provide solved papers for this subject. The page is mainly for previous year question papers and exam practice.

05 How do these papers help with exam preparation?

They help students understand the question pattern, practise repeated topics, and revise Irrigation Engineering more efficiently before the exam.