Solved question paper for IED Dec-2008 (DIPLOMA 5th)

Solved Question Paper

Irrigation engineering and drawing Dec-2008

PSBTE • DIPLOMA • Cvil Engineering • 5th • Dec-2008

IED (Irrigation Engineering and Drawing) is a 5th semester subject in Punjab State Board of Technical Education Diploma in Engineering for Civil Engineering students. On this page, students can look for subject-wise previous year question papers and old papers for revision, practice, and a better understanding of the exam pattern. It helps in identifying important topics, repeated questions, and the style of questions asked in diploma civil exams. BRpaper is not the official website of Punjab State Board of Technical Education or any board, and it only helps students find exam preparation material related to this subject.

Solved Questions

Solved
  1. Art of irrigation is practiced in India since _______.
    Fill in the Blanks Dec-2008 • PSBTE DIPLOMA
  2. Delta of a crop means _______.
    Fill in the Blanks Dec-2008 • PSBTE DIPLOMA
  3. Gravity dam can be constructed with _______.
    Fill in the Blanks Dec-2008 • PSBTE DIPLOMA
  4. Main canal takes-off from _______.
    Fill in the Blanks Dec-2008 • PSBTE DIPLOMA
  5. Siphon aqueduct is a structure in which drain flows below a canal such that its H.F.L. _______.
    Fill in the Blanks Dec-2008 • PSBTE DIPLOMA
  6. Over-irrigation results in fertility.
    True / False Dec-2008 • PSBTE DIPLOMA
  7. Rabi crops pertain to winter season.
    True / False Dec-2008 • PSBTE DIPLOMA
  8. Shape of gravity dam is roughly triangular.
    True / False Dec-2008 • PSBTE DIPLOMA
  9. Lunidation canals are perennial.
    True / False Dec-2008 • PSBTE DIPLOMA
  10. Head regulator is a structure which regulates river flow.
    True / False Dec-2008 • PSBTE DIPLOMA
  11. What are the factors affecting run-off? Explain.
    Long Answer Dec-2008 • PSBTE DIPLOMA
  12. Enumerate the advantages and disadvantages of tube well irrigation.
    Long Answer Dec-2008 • PSBTE DIPLOMA
  13. Give the classification of canals. Also give the disadvantages of any one type of canal lining.
    Long Answer Dec-2008 • PSBTE DIPLOMA
  14. Explain any one method of determining yield of well.
    Long Answer Dec-2008 • PSBTE DIPLOMA
  15. What are the causes of failure of earth dams?
    Long Answer Dec-2008 • PSBTE DIPLOMA
  16. Differentiate between weir and barrage.
    Long Answer Dec-2008 • PSBTE DIPLOMA
  17. Define energy dissipaters and draw labeled sketches.
    Long Answer Dec-2008 • PSBTE DIPLOMA
  18. What are the causes and effects of waterlogging?
    Long Answer Dec-2008 • PSBTE DIPLOMA
  19. Draw the typical cross-section and cross-section of a weir.
    Long Answer Dec-2008 • PSBTE DIPLOMA
  20. Draw the labeled cross-section of a diaphragm type of an earthen dam.
    Long Answer Dec-2008 • PSBTE DIPLOMA
  21. Draw the labeled cross-section of a tube well.
    Long Answer Dec-2008 • PSBTE DIPLOMA

Explore all data

FAQ

Frequently Asked Questions

Answers about this subject, solved papers, and preparation.

Updated regularly
01 What is IED in Diploma Civil Engineering 5th semester?

IED stands for Irrigation Engineering and Drawing, a 5th semester subject in PSBTE Diploma in Civil Engineering.

02 Can I find previous year question papers for IED here?

Yes, this page is meant to help students find subject-wise previous year papers and old papers for IED.

03 How do I use IED old question papers for exam preparation?

You can revise important topics, practice recurring questions, and get familiar with the usual exam pattern and question style.

04 Are these official PSBTE papers?

No, BRpaper is not the official website of Punjab State Board of Technical Education. It only helps students locate exam preparation material.

05 Do you provide solved papers for IED?

This page focuses on previous year and old question papers. Solved papers or answers are not guaranteed unless clearly shown on the page.