IED (Irrigation Engineering and Drawing) is a 5th semester subject in Punjab State Board of Technical Education Diploma in Engineering for Civil Engineering students. On this page, students can look for subject-wise previous year question papers and old papers for revision, practice, and a better understanding of the exam pattern. It helps in identifying important topics, repeated questions, and the style of questions asked in diploma civil exams. BRpaper is not the official website of Punjab State Board of Technical Education or any board, and it only helps students find exam preparation material related to this subject.
Solved Questions
Solved-
The crop which lasts all the year is known as ____ crop.Fill in the Blanks 1 Marks Dec-2009 • PSBTE DIPLOMA
-
Dec 2009 The crop which lasts all the year is known as ____ crop.
-
-
____ deals with all aspects of water available on the earth.Fill in the Blanks 1 Marks Dec-2009 • PSBTE DIPLOMA
-
Dec 2009 _____ deals with all aspects of water available on the earth.
-
-
A ____ is used to measure velocity of flow.Fill in the Blanks 1 Marks Dec-2009 • PSBTE DIPLOMA
-
____ storage = Live storage + Dead storage.Fill in the Blanks 1 Marks Dec-2009 • PSBTE DIPLOMA
-
Dec 2009 Storage = Live storage + Dead storage.
-
-
Silting of reservoir ____ efficiency of dam.Fill in the Blanks 1 Marks Dec-2009 • PSBTE DIPLOMA
-
Dec 2009 Silting of reservoir efficiency of dam.
-
-
When foundation is strong, ____ dam is most suitable.Fill in the Blanks 1 Marks Dec-2009 • PSBTE DIPLOMA
-
May 2015 When foundation is strong, __________ dam is most suitable.
-
Dec 2009 When foundation is strong, dam is most suitable.
-
-
____ performs the function of a safety valve in reservoirs.Fill in the Blanks 1 Marks Dec-2009 • PSBTE DIPLOMA
-
Dec 2009 _____ performs the function of a safety valve in reservoirs.
-
-
The canal aligned along the watershed is known as ____.Fill in the Blanks 1 Marks Dec-2009 • PSBTE DIPLOMA
-
Dec 2009 The canal aligned along the watershed is known as _____.
-
-
Extreme condition of the meanders is called ____.Fill in the Blanks 1 Marks Dec-2009 • PSBTE DIPLOMA
-
Dec 2009 Extreme condition of the meanders is called _____.
-
-
When a canal has to cross over a drain, the structure constructed is known as ____.Fill in the Blanks 1 Marks Dec-2009 • PSBTE DIPLOMA
-
May 2015 When a canal has to cross over a drain, structure constructed is known as ___________.
-
Dec 2009 When a canal has to cross over a drain, structure constructed is known as _____.
-
-
Berms are provided to strengthen the canal bank.True / False 1 Marks Dec-2009 • PSBTE DIPLOMA
-
Head works can be constructed usefully in the hilly river reach.True / False 1 Marks Dec-2009 • PSBTE DIPLOMA
-
Dec 2009 Head works are constructed as a regulating structure in the hilly river reach.
-
-
On pervious foundations rock-fill weir is most suitable.True / False 1 Marks Dec-2009 • PSBTE DIPLOMA
-
Dec 2009 On pervious foundations rock-fill weir is most suitable.
-
-
A structure that takes out silt from a canal is called silt ejector.True / False 1 Marks Dec-2009 • PSBTE DIPLOMA
-
Dec 2009 A structure that takes out silt from a canal is called silt ejector.
-
-
Remedial measures to control water-logging are implementation of a drainage scheme.True / False 1 Marks Dec-2009 • PSBTE DIPLOMA
-
Dec 2009 Remedial measures to control water-logging are implementation of a drainage scheme.
-
-
Explain the various prevention and remedies for waterlogging.Short Answer 10 Marks Dec-2009 • PSBTE DIPLOMA
-
Dec 2009 Explain the various prevention and remedies for waterlogging.
-
-
Discuss the various surface and sub-surface drains.Short Answer 10 Marks Dec-2009 • PSBTE DIPLOMA
-
Dec 2009 Discuss the various surface and sub-surface drains.
-
-
Explain the various energy dissipation devices below falls.Short Answer 10 Marks Dec-2009 • PSBTE DIPLOMA
-
Dec 2009 Explain the various energy dissipation devices below falls.
-
-
Explain siphon aqueduct with the help of a sketch.Short Answer 10 Marks Dec-2009 • PSBTE DIPLOMA
-
Dec 2009 Explain siphon aqueduct with the help of a sketch.
-
-
Enumerate the various constituent parts of canal head works and give detail of any two.Short Answer 10 Marks Dec-2009 • PSBTE DIPLOMA
-
Dec 2009 Enumerate the various constituent parts of canal head works and give detail of any one.
-
-
Give comparison of concrete and brick lining.Short Answer 10 Marks Dec-2009 • PSBTE DIPLOMA
-
Dec 2009 Give comparison of concrete and brick lining.
-
-
Define Delta, Duty and Base period and also give relationship between them.Short Answer 10 Marks Dec-2009 • PSBTE DIPLOMA
-
May 2015 Define duty, delta and base period.
-
Dec 2009 Define Delta, Duty and Base period and also give relationship between them.
-
May 2007 Establish the relationship between duty, delta and base period.
-
-
Explain the various factors affecting run-off of a catchment area.Short Answer 10 Marks Dec-2009 • PSBTE DIPLOMA
-
May 2015 Define intensity of rainfall, runoff and catchment area. What are the different factors affecting runoff?
-
Dec 2009 Explain the various factors affecting run-off of a catchment area.
-
-
Draw the labeled x-section of a diaphragm type earthen dam.Long Answer 25 Marks Dec-2009 • PSBTE DIPLOMA
-
May 2015 Draw the labeled cross section of a earthen dam.
-
May 2010 Draw a labeled cross-section of a gravity dam.
-
May 2010 Draw the labeled cross-section of a zoned type earthen dam.
-
Dec 2009 Draw the lateral section of a diaphragm type earthen dam.
-
May 2008 Draw a labeled cross-section of a gravity dam.
-
Dec 2008 Draw the labeled cross-section of a diaphragm type of an earthen dam.
-
Dec 2008 Draw the labeled cross-section of a diaphragm type of an earthen dam.
-
-
Draw the labeled cross-section of a tube-well.Long Answer 25 Marks Dec-2009 • PSBTE DIPLOMA
-
May 2016 Draw Cross section of Tube well with Pump house.
-
May 2015 Draw the labeled cross section of tube well.
-
May 2010 Draw the labeled cross-section of a tubewell.
-
Dec 2009 Draw the labeled cross-section of a tube-well.
-
Dec 2008 Draw the labeled cross-section of a tube well.
-
Dec 2008 Draw the labeled cross-section of a tube well.
-
-
Draw the labeled layout plan of a canal head works with all constituent parts.Long Answer 25 Marks Dec-2009 • PSBTE DIPLOMA
-
Dec 2009 Draw the labeled layout plan of a canal head works with all constituent parts.
-
May 2008 Draw a labeled layout plan of a canal head works.
-
Explore all data
FAQ
Frequently Asked Questions
Answers about this subject, solved papers, and preparation.
01 What is IED in Diploma Civil Engineering 5th semester?
IED stands for Irrigation Engineering and Drawing, a 5th semester subject in PSBTE Diploma in Civil Engineering.
02 Can I find previous year question papers for IED here?
Yes, this page is meant to help students find subject-wise previous year papers and old papers for IED.
03 How do I use IED old question papers for exam preparation?
You can revise important topics, practice recurring questions, and get familiar with the usual exam pattern and question style.
04 Are these official PSBTE papers?
No, BRpaper is not the official website of Punjab State Board of Technical Education. It only helps students locate exam preparation material.
05 Do you provide solved papers for IED?
This page focuses on previous year and old question papers. Solved papers or answers are not guaranteed unless clearly shown on the page.