Solved question paper for RBT Dec-2008 (DIPLOMA 5th)

Solved Question Paper

Railways, bridges and tunnels Dec-2008

PSBTE • DIPLOMA • Cvil Engineering • 5th • Dec-2008

RBT (Railways, Bridges and Tunnels) for Punjab State Board of Technical Education Diploma in Engineering Civil Engineering 5th Semester helps students find subject-wise previous year question papers and old papers for exam preparation. It is useful for revision, understanding question style, and getting a better idea of the civil engineering exam pattern before tests. Students can use this page to look for previous year papers related to Railways, Bridges and Tunnels, and review important topics that often appear in semester exams. BRpaper is not the official website of Punjab State Board of Technical Education or any board or university mentioned here.

Solved Questions

Solved
  1. Railway provides a convenient and safe means of ______ of people and goods over large distance in a country.
    Fill in the Blanks 1 Marks Dec-2008 • PSBTE DIPLOMA
  2. Welding of rail ______ their life.
    Fill in the Blanks 1 Marks Dec-2008 • PSBTE DIPLOMA
  3. The plate laying is usually done by ______ method in India.
    Fill in the Blanks 1 Marks Dec-2008 • PSBTE DIPLOMA
  4. The alignment of bridge ______ be curved and skew.
    Fill in the Blanks 1 Marks Dec-2008 • PSBTE DIPLOMA
  5. The object of tunnel ventilation is to remove ______.
    Fill in the Blanks 1 Marks Dec-2008 • PSBTE DIPLOMA
  6. The first public railway was opened between Stockton and Darlington on 27th September 1825.
    True / False 1 Marks Dec-2008 • PSBTE DIPLOMA
  7. The permanent way is sufficiently strong against lateral forces.
    True / False 1 Marks Dec-2008 • PSBTE DIPLOMA
  8. Double headed rails are having same dimension of head and foot.
    True / False 1 Marks Dec-2008 • PSBTE DIPLOMA
  9. Concrete sleeper required more fastening.
    True / False 1 Marks Dec-2008 • PSBTE DIPLOMA
  10. Rail gauge is used for checking the level of rails.
    True / False 1 Marks Dec-2008 • PSBTE DIPLOMA
  11. In case of bridge there is not limit of number of spans.
    True / False 1 Marks Dec-2008 • PSBTE DIPLOMA
  12. High level causeway come under permanent bridges.
    True / False 1 Marks Dec-2008 • PSBTE DIPLOMA
  13. The stream at bridge site should be free from costlier river training works.
    True / False 1 Marks Dec-2008 • PSBTE DIPLOMA
  14. The best shape of tunnel to be constructed for carrying a road is horse shoe section.
    True / False 1 Marks Dec-2008 • PSBTE DIPLOMA
  15. For drilling holes in hard rock sledge hammer is used.
    True / False 1 Marks Dec-2008 • PSBTE DIPLOMA
  16. Advantages of steel sleeper.
    Short Answer 3 Marks Dec-2008 • PSBTE DIPLOMA
  17. Advantages of bearing plates.
    Short Answer 3 Marks Dec-2008 • PSBTE DIPLOMA
  18. Function of ballast.
    Short Answer 3 Marks Dec-2008 • PSBTE DIPLOMA
  19. Name the tools required for track maintenance.
    Short Answer 3 Marks Dec-2008 • PSBTE DIPLOMA
  20. Name the component parts of a bridge.
    Short Answer 3 Marks Dec-2008 • PSBTE DIPLOMA
  21. Differentiate between abutment and pier.
    Short Answer 3 Marks Dec-2008 • PSBTE DIPLOMA
  22. Routine maintenance of bridges.
    Short Answer 3 Marks Dec-2008 • PSBTE DIPLOMA
  23. Mucking.
    Short Answer 3 Marks Dec-2008 • PSBTE DIPLOMA
  24. Lighting of tunnels.
    Short Answer 3 Marks Dec-2008 • PSBTE DIPLOMA
  25. Necessity of ventilation in tunnels.
    Short Answer 3 Marks Dec-2008 • PSBTE DIPLOMA
  26. Concept of creep in Railway.
    Short Answer 3 Marks Dec-2008 • PSBTE DIPLOMA
  27. Advantages of good maintenance of track.
    Short Answer 3 Marks Dec-2008 • PSBTE DIPLOMA
  28. Explain the various methods of plate laying. Discuss the conditions under which each of them is suitable.
    Long Answer 10 Marks Dec-2008 • PSBTE DIPLOMA
  29. How do you classify bridges? Give a complete scheme of their classification.
    Long Answer 10 Marks Dec-2008 • PSBTE DIPLOMA
  30. Draw a neat diagram showing the typical section of tunnel meant for a single line Broad gauge railway track.
    Long Answer 10 Marks Dec-2008 • PSBTE DIPLOMA
  31. What are the requirements of an ideal permanent way?
    Long Answer Dec-2008 • PSBTE DIPLOMA
  32. What data is necessary to be collected for design of bridge?
    Long Answer Dec-2008 • PSBTE DIPLOMA
  33. What are the requirements of an ideal sleeper?
    Long Answer Dec-2008 • PSBTE DIPLOMA
  34. Explain the system of drainage of tunnels.
    Long Answer Dec-2008 • PSBTE DIPLOMA

Explore all data

FAQ

Frequently Asked Questions

Answers about this subject, solved papers, and preparation.

Updated regularly
01 Where can I find RBT previous year question papers for 5th semester civil engineering?

This page is made for RBT subject-wise previous year question papers for PSBTE Diploma in Civil Engineering 5th semester.

02 What does RBT stand for in this subject page?

RBT stands for Railways, Bridges and Tunnels.

03 Are these papers useful for exam revision?

Yes, old RBT papers can help students revise important topics and understand the exam pattern.

04 Does BRpaper provide official question papers from the board?

No. BRpaper is not the official website of Punjab State Board of Technical Education or any university or board mentioned on this page.

05 Can I use this page to check subject-wise civil engineering papers?

Yes, this page is focused on the RBT subject and supports subject-wise browsing for 5th semester civil engineering papers.