RBT (Railways, Bridges and Tunnels) for Punjab State Board of Technical Education Diploma in Engineering Civil Engineering 5th Semester helps students find subject-wise previous year question papers and old papers for exam preparation. It is useful for revision, understanding question style, and getting a better idea of the civil engineering exam pattern before tests. Students can use this page to look for previous year papers related to Railways, Bridges and Tunnels, and review important topics that often appear in semester exams. BRpaper is not the official website of Punjab State Board of Technical Education or any board or university mentioned here.

Solved Questions

Solved
  1. The railways provided just below the ground level are called __________.
    Fill in the Blanks 1 Marks Dec-2015 • PSBTE DIPLOMA
  2. The gauge of the permanent way should not get __________.
    Fill in the Blanks 1 Marks Dec-2015 • PSBTE DIPLOMA
  3. The standard rail length for a B.G track in India is __________.
    Fill in the Blanks 1 Marks Dec-2015 • PSBTE DIPLOMA
  4. A good sleeper should be __________ in their initial as well as maintenance cost.
    Fill in the Blanks 1 Marks Dec-2015 • PSBTE DIPLOMA
  5. The function of ballast is provide __________ bed for sleepers.
    Fill in the Blanks 1 Marks Dec-2015 • PSBTE DIPLOMA
  6. The basic object of signaling is to __________ the movement of trains efficiently.
    Fill in the Blanks 1 Marks Dec-2015 • PSBTE DIPLOMA
  7. A culvert has a span usually less than __________.
    Fill in the Blanks 1 Marks Dec-2015 • PSBTE DIPLOMA
  8. The end supports of the superstructure of a bridge are called __________.
    Fill in the Blanks 1 Marks Dec-2015 • PSBTE DIPLOMA
  9. The tunnels which are used for carrying roads and railway track are known as __________ tunnel.
    Fill in the Blanks 1 Marks Dec-2015 • PSBTE DIPLOMA
  10. The art of providing freshness of air in tunnels during and after the construction is called __________ in the tunnels.
    Fill in the Blanks 1 Marks Dec-2015 • PSBTE DIPLOMA
  11. Welding of rails increases their life.
    True / False 1 Marks Dec-2015 • PSBTE DIPLOMA
  12. Points and crossing are provided for change gradient on permanent ways.
    True / False 1 Marks Dec-2015 • PSBTE DIPLOMA
  13. A bridge crossing the river at right angle is called skew bridge.
    True / False 1 Marks Dec-2015 • PSBTE DIPLOMA
  14. The best shape of tunnel to be used for carrying road or railway track is horse shoe section.
    True / False 1 Marks Dec-2015 • PSBTE DIPLOMA
  15. The natural ventilation system of tunnels is commonly used.
    True / False 1 Marks Dec-2015 • PSBTE DIPLOMA
  16. What do you understand by permanent way? Draw section showing component parts of permanent way.
    Long Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  17. What do you understand by creep of rails? Give its causes and effects.
    Long Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  18. Write a short note on coning of wheels and tilting of rails.
    Short Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  19. What do you understand by signaling? What are objects of signaling?
    Long Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  20. Define fixtures and fastening. Give their functions. Name the various types of fixtures and fastenings.
    Long Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  21. Define the component parts of bridge. Give their functions.
    Long Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  22. Define abutments of a bridge. Give the functions and requirements of a good abutments.
    Long Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  23. What are advantages and disadvantages of tunnels?
    Short Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  24. Draw the cross-section of tunnel for double line broad gauge railway track.
    Short Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  25. Define a gauge. What are the different types of gauge used in India? Discuss the factor affecting the adaption of a particular gauge.
    Long Answer 10 Marks Dec-2015 • PSBTE DIPLOMA
  26. What are the functions of railway sleepers? Give the requirements of a good sleeper. Name various types of sleepers and explain any one.
    Long Answer 10 Marks Dec-2015 • PSBTE DIPLOMA
  27. Give the classification of the various types of bridges depending upon live loading, materials and structural form.
    Long Answer 10 Marks Dec-2015 • PSBTE DIPLOMA
  28. Explain the method of construction of tunnels in a soft rock by needle beam method.
    Long Answer 10 Marks Dec-2015 • PSBTE DIPLOMA
  29. Name the different components of a well foundation and explain with a neat sketch.
    Long Answer 10 Marks Dec-2015 • PSBTE DIPLOMA

Explore all data

FAQ

Frequently Asked Questions

Answers about this subject, solved papers, and preparation.

Updated regularly
01 Where can I find RBT previous year question papers for 5th semester civil engineering?

This page is made for RBT subject-wise previous year question papers for PSBTE Diploma in Civil Engineering 5th semester.

02 What does RBT stand for in this subject page?

RBT stands for Railways, Bridges and Tunnels.

03 Are these papers useful for exam revision?

Yes, old RBT papers can help students revise important topics and understand the exam pattern.

04 Does BRpaper provide official question papers from the board?

No. BRpaper is not the official website of Punjab State Board of Technical Education or any university or board mentioned on this page.

05 Can I use this page to check subject-wise civil engineering papers?

Yes, this page is focused on the RBT subject and supports subject-wise browsing for 5th semester civil engineering papers.