Top 20 Questions of EC (DIPLOMA Cvil Engineering 6th)

Most Repeated Questions

Top 20 Questions of Estimating and costing

Previous year question paper with solutions for Top repeated questions of Estimating and costing

PSBTE • DIPLOMA • Cvil Engineering • 6th

Browse Top 20 questions of EC (DIPLOMA Cvil Engineering 6th) previous year question papers for Top repeated questions of Estimating and costing. This page helps EC students find semester-wise papers for revision, exam practice, and understanding previous exam patterns. These are the top twenty repeated questions identified from previous year papers for EC (DIPLOMA Cvil Engineering 6th), helping students focus on the most frequently asked topics.

Top repeated questions

Top 20
  1. 1.

    Estimate the quantity of earth work in excavation for foundation for the single-roomed building shown in Figure 1.

    Appeared 3 times

    Appeared in: Dec 2008

  2. 2.

    Estimate the quantity of cement concrete (1:5:10) in foundation for the single-roomed building shown in Figure 1.

    Appeared 1 times

    Appeared in: Dec 2008

  3. 3.

    Calculate the quantities of various materials required for 10 cum brick masonry in cement sand mortar 1:5.

    Appeared 1 times

    Appeared in: Dec 2008

  4. 4.

    Calculate the quantities of various materials required for 10 cum cement concrete 1:2:4.

    Appeared 1 times

    Appeared in: Dec 2008

  5. 5.

    Analyze the rate of cement concrete 1:5:10 in foundation.

    Appeared 1 times

    Appeared in: Dec 2008