Solved question paper for QSV Dec-2008 (DIPLOMA 6th)
Solved Question Paper
Quantity surveying and valuation Dec-2008
PSBTE • DIPLOMA • Cvil Engineering • 6th • Dec-2008
QSV (Quantity Surveying and Valuation) for Punjab State Board of Technical Education Diploma in Engineering Civil Engineering 6th semester helps students find subject-wise previous year question papers, old papers, and exam preparation material. These papers are useful for revision, understanding the exam pattern, and spotting repeated question styles before the exam. BRpaper is not the official website of the Punjab State Board of Technical Education or any board or university. Use this page to explore QSV question paper PDFs and old exam papers for better practice and preparation.
Solved Questions
Solved-
Work out the quantities of excavation for foundation for a room as shown in Figure 1.Long Answer 5 Marks Dec-2008 • PSBTE DIPLOMA
-
May 2022 Work out the Quantities of Mud Masonry in Foundation and Plinth from the given Drawing (Wall thickness-0.30 m all around).
-
May 2017 Work out the quantity of mud masonry in foundation and plinth from the given drawing.
-
Dec 2016 Work out the quantities of brick masonry in foundation and plinth from the given drawing.
-
May 2015 Work out the quantity of mud masonry in foundation and plinth from the given drawing.
-
Dec 2008 Work out the quantities of lime concrete in foundation for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of mud masonry in foundation and plinth for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of mud masonry in super structure for a room as shown in Figure 1.
-
May 2007 Work out quantities of excavation for foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of CC in foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of brick work in foundation and plinth in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of brick work in super structure in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
-
Work out the quantities of lime concrete in foundation for a room as shown in Figure 1.Long Answer 5 Marks Dec-2008 • PSBTE DIPLOMA
-
May 2022 Work out the Quantities of Mud Masonry in Foundation and Plinth from the given Drawing (Wall thickness-0.30 m all around).
-
May 2017 Work out the quantity of mud masonry in foundation and plinth from the given drawing.
-
Dec 2016 Work out the quantities of brick masonry in foundation and plinth from the given drawing.
-
May 2015 Work out the quantity of mud masonry in foundation and plinth from the given drawing.
-
Dec 2008 Work out the quantities of excavation for foundation for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of mud masonry in foundation and plinth for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of mud masonry in super structure for a room as shown in Figure 1.
-
May 2007 Work out quantities of excavation for foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of CC in foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of brick work in foundation and plinth in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of brick work in super structure in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
-
Work out the quantities of mud masonry in foundation and plinth for a room as shown in Figure 1.Long Answer 7 Marks Dec-2008 • PSBTE DIPLOMA
-
May 2022 Work out the Quantities of Mud Masonry in Foundation and Plinth from the given Drawing (Wall thickness-0.30 m all around).
-
May 2017 Work out the quantity of mud masonry in foundation and plinth from the given drawing.
-
Dec 2016 Work out the quantities of brick masonry in foundation and plinth from the given drawing.
-
May 2015 Work out the quantity of mud masonry in foundation and plinth from the given drawing.
-
Dec 2008 Work out the quantities of excavation for foundation for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of lime concrete in foundation for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of mud masonry in super structure for a room as shown in Figure 1.
-
May 2007 Work out quantities of excavation for foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of CC in foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of brick work in foundation and plinth in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of brick work in super structure in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
-
Work out the quantities of mud masonry in super structure for a room as shown in Figure 1.Long Answer 5 Marks Dec-2008 • PSBTE DIPLOMA
-
May 2022 Work out the Quantities of Mud Masonry in Foundation and Plinth from the given Drawing (Wall thickness-0.30 m all around).
-
May 2017 Work out the quantity of mud masonry in foundation and plinth from the given drawing.
-
Dec 2016 Work out the quantities of brick masonry in foundation and plinth from the given drawing.
-
May 2015 Work out the quantity of mud masonry in foundation and plinth from the given drawing.
-
Dec 2008 Work out the quantities of excavation for foundation for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of lime concrete in foundation for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of mud masonry in foundation and plinth for a room as shown in Figure 1.
-
May 2007 Work out quantities of excavation for foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of CC in foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of brick work in foundation and plinth in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of brick work in super structure in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
-
Write the main duties of quantity surveyor.Short Answer 5 Marks Dec-2008 • PSBTE DIPLOMA
-
May 2022 Give the duties of Quantity Surveyor.
-
May 2022 What are the duties of Quantity Surveyor?
-
-
Write the units of measurement and payment for sand filling.Short Answer 1.5 Marks Dec-2008 • PSBTE DIPLOMA
-
May 2010 Write the unit of measurement and payment for sand.
-
-
Write the units of measurement and payment for precast cement concrete.Short Answer 1.5 Marks Dec-2008 • PSBTE DIPLOMA
-
May 2022 State the Units of Measurement for Cement Plaster.
-
May 2022 State the unit of measurement for Cement Plaster.
-
May 2022 State the unit of measurement for Cement Plaster.
-
Dec 2017 State the units of measurement for cement concrete.
-
Dec 2016 State the Units of Measurement of lime concrete.
-
Dec 2015 State the units of measurements for cement concrete.
-
Dec 2015 State the units of measurements for cement plaster.
-
Dec 2015 Units of payment for cement concrete is ___________.
-
-
Write the units of measurement and payment for drain including plaster.Short Answer 1.5 Marks Dec-2008 • PSBTE DIPLOMA
-
Write the units of measurement and payment for cut stone work in jali.Short Answer 1.5 Marks Dec-2008 • PSBTE DIPLOMA
-
May 2007 Give the unit of measurement for cut stone work in Jali.
-
-
Write the units of measurement and payment for expansion joint.Short Answer 1.5 Marks Dec-2008 • PSBTE DIPLOMA
-
Dec 2016 State the Units of Measurement of expansion joints.
-
-
Write the units of measurement and payment for R.C.C. slab roofing.Short Answer 1.5 Marks Dec-2008 • PSBTE DIPLOMA
-
May 2019 State the unit of measurement for R.C.C. slab roofing.
-
-
Write the units of measurement and payment for distemper.Short Answer 1.5 Marks Dec-2008 • PSBTE DIPLOMA
-
Write the units of measurement and payment for sawing of timber.Short Answer 1.5 Marks Dec-2008 • PSBTE DIPLOMA
-
May 2017 State the unit of measurement for supply of timber.
-
May 2008 Give the unit of measurement and unit of payment for supply of timber.
-
May 2007 Give the unit of measurement for sawing of timber.
-
-
Calculate the quantities of materials required for 10 m³ of c. concrete (1:2:4).Long Answer 6 Marks Dec-2008 • PSBTE DIPLOMA
-
Mention the various steps involved in the analysis of rates for R.C.C. work in roof slab.Long Answer 6 Marks Dec-2008 • PSBTE DIPLOMA
-
Explain in brief: Tender notice.Short Answer 2 Marks Dec-2008 • PSBTE DIPLOMA
-
Explain in brief: Contract.Short Answer 2 Marks Dec-2008 • PSBTE DIPLOMA
-
Explain in brief: Earnest money.Short Answer 2 Marks Dec-2008 • PSBTE DIPLOMA
-
May 2022 Define Earnest Money.
-
-
Explain in brief: Retention money.Short Answer 2 Marks Dec-2008 • PSBTE DIPLOMA
-
May 2010 Define retention money.
-
-
Explain in brief: Tender rate contract.Short Answer 2 Marks Dec-2008 • PSBTE DIPLOMA
-
Explain in brief: Maintenance period.Short Answer 2 Marks Dec-2008 • PSBTE DIPLOMA
-
Prepare tender document for woodwork including polishing.Long Answer 6 Marks Dec-2008 • PSBTE DIPLOMA
-
Define valuation and explain purpose of valuation.Long Answer 6 Marks Dec-2008 • PSBTE DIPLOMA
-
May 2022 What is Valuation? Write down the purpose of Valuation.
-
May 2020 What is Valuation? Write down the purpose of Valuation.
-
May 2019 What is valuation? Give the purpose of valuation.
-
May 2018
Define valuation. Give the purpose of valuation
-
Dec 2018
What is Valuation? Write down the purpose of Valuation.
-
May 2017 Define valuation. Give the purpose of valuation. State and explain the various methods of valuation.
-
May 2016 Write short note on Purpose of valuation.
-
Dec 2016 What is valuation? Give the purpose of valuation.
-
May 2015 Define valuation. Give the purpose of valuation. State and explain the various methods of valuation.
-
Dec 2015 What is valuation?
-
Dec 2015 Write down the purpose of valuation.
-
May 2010 Explain the purpose of valuation.
-
May 2007 What is the purpose of valuation?
-
-
Calculate the quantities of earth work for a portion of channel from the following data: Bed width = 5 m, Full supply depth = 0.6 m, Free board = 0.5 m, Bed slope = 1 in 5000. Rd/GL/Proposed Bed Level: 0/241.60/241.00, 500/241.50, 1000/241.30, 1500/241.10.Long Answer 12 Marks Dec-2008 • PSBTE DIPLOMA
-
May 2016 Work out the quantities of earthwork for a channel from the given data: RD 0 500 1000 1500; GL 341.400 341.300 341.100 340.900; PBL = 340.800 m, bed width 4 m, side slope in cutting 1:1 and in filling 1.5:1, bank width 1.5 m on both sides. FSD is 60 cm, free board is 45 cm. Bed slope is 1 in 5000.
-
May 2008 Calculate the quantity of earthwork for a canal having the given data: RD 0, 250, 500, 750, 1000; NSL 220.50, 220.30, 220.50, 220.15, 220.05; bed width = 3 m; F.S.D. = 0.75 m; F.B. = 0.45 m; top width of banks = 1.5 m; side slope in banking = 1.5:1; side slope in cutting = 1:1; bed slope = 1 in 5000; R.L. of bed at Rd 0 = 220.00.
-
May 2007 Find out the quantity of earth work for 1500 m length of a channel with the given data: Bed level at R.D. 0 = 237.50 m; Bed width = 4.0 m; Free board = 45 cm; Bank width on both sides = 1.50 m; Side slope in cutting = 1:1; Side slope in filling = 1.5:1 (H:V); Bed slope = 1 in 5000; R.D. (m): 0, 500, 1000, 1500; Ground level: 237.90, 237.80, 237.60, 237.40.
-
Explore all data
FAQ
Frequently Asked Questions
Answers about this subject, solved papers, and preparation.
01 Where can I find QSV previous year question papers for Civil Engineering 6th semester?
You can use this page to look for QSV old question papers and previous year papers for PSBTE Diploma in Civil Engineering 6th semester.
02 Is this page for Quantity Surveying and Valuation only?
Yes, this page is focused on QSV, which stands for Quantity Surveying and Valuation, for the 6th semester Civil Engineering course.
03 Can I use these papers for revision before exams?
Yes, previous year papers are helpful for revision, practicing questions, and understanding the exam pattern for QSV.
04 Are these official question papers from PSBTE?
No, BRpaper is not the official website of Punjab State Board of Technical Education. It only helps students find previous year papers and related study material.
05 Do you provide solved QSV question papers?
Some question papers may be available for practice, but this page does not guarantee solved papers for every year.