QSV (Quantity Surveying and Valuation) for Punjab State Board of Technical Education Diploma in Engineering Civil Engineering 6th semester helps students find subject-wise previous year question papers, old papers, and exam preparation material. These papers are useful for revision, understanding the exam pattern, and spotting repeated question styles before the exam. BRpaper is not the official website of the Punjab State Board of Technical Education or any board or university. Use this page to explore QSV question paper PDFs and old exam papers for better practice and preparation.

Solved Questions

Solved
  1. State the units of measurements for brick work.
    Short Answer 1 Marks Dec-2015 • PSBTE DIPLOMA
  2. State the units of measurements for steel work.
    Short Answer 1 Marks Dec-2015 • PSBTE DIPLOMA
  3. State the units of measurements for earth work.
    Short Answer 1 Marks Dec-2015 • PSBTE DIPLOMA
  4. State the units of measurements for R.C.C. works.
    Short Answer 1 Marks Dec-2015 • PSBTE DIPLOMA
  5. State the units of measurements for painting.
    Short Answer 1 Marks Dec-2015 • PSBTE DIPLOMA
  6. State the units of measurements for cement concrete.
    Short Answer 1 Marks Dec-2015 • PSBTE DIPLOMA
  7. State the units of measurements for drip course.
    Short Answer 1 Marks Dec-2015 • PSBTE DIPLOMA
  8. State the units of measurements for cement plaster.
    Short Answer 1 Marks Dec-2015 • PSBTE DIPLOMA
  9. State the units of measurements for drain.
    Short Answer 1 Marks Dec-2015 • PSBTE DIPLOMA
  10. State the units of measurements for flooring.
    Short Answer 1 Marks Dec-2015 • PSBTE DIPLOMA
  11. Number of bricks required for 1 cum. brick masonry is __________.
    Fill in the Blanks 1 Marks Dec-2015 • PSBTE DIPLOMA
  12. Dry mortar required for 1 cum cement concrete is __________.
    Fill in the Blanks 1 Marks Dec-2015 • PSBTE DIPLOMA
  13. One bag of cement = __________ Kg.
    Fill in the Blanks 1 Marks Dec-2015 • PSBTE DIPLOMA
  14. Units of payment for cement concrete is ___________.
    Fill in the Blanks 1 Marks Dec-2015 • PSBTE DIPLOMA
  15. Units of payment for stone work in wall facing is ___________.
    Fill in the Blanks 1 Marks Dec-2015 • PSBTE DIPLOMA
  16. Write a short note on plinth area estimate.
    Short Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  17. Write a short note on detailed estimate.
    Short Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  18. Explain centre line method of building estimate.
    Short Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  19. Find out dry material required for 1 cum. brick masonry in cement mortar 1:5.
    Short Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  20. Write down the general specification for earth work in embankment.
    Short Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  21. What is valuation?
    Short Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  22. Write down the purpose of valuation.
    Short Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  23. Define tender.
    Short Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  24. Write the name of various tender documents.
    Short Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  25. Calculate the quantity of brick work in a semi-circular arch with forming data: Span = 2.00 m, thickness of arch = 30 cm, breadth of wall = 40 cm.
    Short Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  26. Write a short note on muster roll.
    Short Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  27. Write a short note on lump-sum contract.
    Short Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  28. What is contractor?
    Short Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  29. Write the qualification of a good contractor.
    Short Answer 5 Marks Dec-2015 • PSBTE DIPLOMA
  30. Define contract and explain different types of contracts.
    Long Answer 10 Marks Dec-2015 • PSBTE DIPLOMA
  31. Work out the quantity of excavation for foundation from the given drawing of a room 4 m x 3.60 m.
    Long Answer Dec-2015 • PSBTE DIPLOMA
  32. Work out the quantity of C. concrete in foundation from the given drawing of a room 4 m x 3.60 m.
    Long Answer Dec-2015 • PSBTE DIPLOMA
  33. Work out the quantity of brick masonry in foundation and plinth from the given drawing of a room 4 m x 3.60 m.
    Long Answer Dec-2015 • PSBTE DIPLOMA
  34. Work out the quantity of brick masonry in super structure from the given drawing of a room 4 m x 3.60 m.
    Long Answer Dec-2015 • PSBTE DIPLOMA
  35. Explain the various types of estimates.
    Long Answer 10 Marks Dec-2015 • PSBTE DIPLOMA
  36. Write the rule for preparing muster roll.
    Short Answer 10 Marks Dec-2015 • PSBTE DIPLOMA
  37. Explain piece work agreement and give its advantages.
    Long Answer 10 Marks Dec-2015 • PSBTE DIPLOMA
  38. A short link road is to be constructed entirely in cutting at a uniform rising gradient 1 in 30. The N.S. levels are given below: RD 0 = 70.50, 30 = 69.30, 60 = 71.40, 90 = 74.00, 120 = 75.10, 150 = 73.50. If the formation level at 0 is 65 m, estimate the quantity of cutting for a formation width of 10 metres. The side slope is 2:1 (Horizontal: Vertical) and there is no cross slope. Also find the cost of cutting @ Rs. 450 per cum.
    Long Answer 10 Marks Dec-2015 • PSBTE DIPLOMA
  39. Conglomerate floor 4 cm thick cement concrete 1:2:4 over 10 cm thick cement concrete 1:6:18 over 10 cm sand filling. Calculate the dry material and cost of material. The cost of cement is Rs. 300 per bag, sand is Rs. 800 per cum, and aggregate is Rs. 1200 per cum.
    Long Answer 10 Marks Dec-2015 • PSBTE DIPLOMA

Explore all data

FAQ

Frequently Asked Questions

Answers about this subject, solved papers, and preparation.

Updated regularly
01 Where can I find QSV previous year question papers for Civil Engineering 6th semester?

You can use this page to look for QSV old question papers and previous year papers for PSBTE Diploma in Civil Engineering 6th semester.

02 Is this page for Quantity Surveying and Valuation only?

Yes, this page is focused on QSV, which stands for Quantity Surveying and Valuation, for the 6th semester Civil Engineering course.

03 Can I use these papers for revision before exams?

Yes, previous year papers are helpful for revision, practicing questions, and understanding the exam pattern for QSV.

04 Are these official question papers from PSBTE?

No, BRpaper is not the official website of Punjab State Board of Technical Education. It only helps students find previous year papers and related study material.

05 Do you provide solved QSV question papers?

Some question papers may be available for practice, but this page does not guarantee solved papers for every year.