Solved question paper for QSV May-2007 (DIPLOMA 6th)
Solved Question Paper
Quantity surveying and valuation May-2007
PSBTE • DIPLOMA • Cvil Engineering • 6th • May-2007
QSV (Quantity Surveying and Valuation) for Punjab State Board of Technical Education Diploma in Engineering Civil Engineering 6th semester helps students find subject-wise previous year question papers, old papers, and exam preparation material. These papers are useful for revision, understanding the exam pattern, and spotting repeated question styles before the exam. BRpaper is not the official website of the Punjab State Board of Technical Education or any board or university. Use this page to explore QSV question paper PDFs and old exam papers for better practice and preparation.
Solved Questions
Solved-
Work out quantities of excavation for foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).Long Answer May-2007 • PSBTE DIPLOMA
-
May 2022 Work out the Quantities of Mud Masonry in Foundation and Plinth from the given Drawing (Wall thickness-0.30 m all around).
-
May 2017 Work out the quantity of mud masonry in foundation and plinth from the given drawing.
-
Dec 2016 Work out the quantities of brick masonry in foundation and plinth from the given drawing.
-
May 2015 Work out the quantity of mud masonry in foundation and plinth from the given drawing.
-
Dec 2008 Work out the quantities of excavation for foundation for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of lime concrete in foundation for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of mud masonry in foundation and plinth for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of mud masonry in super structure for a room as shown in Figure 1.
-
May 2007 Work out quantities of CC in foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of brick work in foundation and plinth in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of brick work in super structure in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
-
Work out quantities of CC in foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).Long Answer May-2007 • PSBTE DIPLOMA
-
May 2022 Work out the Quantities of Mud Masonry in Foundation and Plinth from the given Drawing (Wall thickness-0.30 m all around).
-
May 2017 Work out the quantity of mud masonry in foundation and plinth from the given drawing.
-
Dec 2016 Work out the quantities of brick masonry in foundation and plinth from the given drawing.
-
May 2015 Work out the quantity of mud masonry in foundation and plinth from the given drawing.
-
Dec 2008 Work out the quantities of excavation for foundation for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of lime concrete in foundation for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of mud masonry in foundation and plinth for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of mud masonry in super structure for a room as shown in Figure 1.
-
May 2007 Work out quantities of excavation for foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of brick work in foundation and plinth in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of brick work in super structure in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
-
Work out quantities of DRC for a two roomed quarter as per drawing given in figure-1 (overleaf).Long Answer May-2007 • PSBTE DIPLOMA
-
Work out quantities of brick work in foundation and plinth in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).Long Answer May-2007 • PSBTE DIPLOMA
-
May 2022 Work out the Quantities of Mud Masonry in Foundation and Plinth from the given Drawing (Wall thickness-0.30 m all around).
-
May 2017 Work out the quantity of mud masonry in foundation and plinth from the given drawing.
-
Dec 2016 Work out the quantities of brick masonry in foundation and plinth from the given drawing.
-
May 2015 Work out the quantity of mud masonry in foundation and plinth from the given drawing.
-
Dec 2008 Work out the quantities of excavation for foundation for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of lime concrete in foundation for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of mud masonry in foundation and plinth for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of mud masonry in super structure for a room as shown in Figure 1.
-
May 2007 Work out quantities of excavation for foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of CC in foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of brick work in super structure in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
-
Work out quantities of brick work in super structure in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).Long Answer May-2007 • PSBTE DIPLOMA
-
May 2022 Work out the Quantities of Mud Masonry in Foundation and Plinth from the given Drawing (Wall thickness-0.30 m all around).
-
May 2017 Work out the quantity of mud masonry in foundation and plinth from the given drawing.
-
Dec 2016 Work out the quantities of brick masonry in foundation and plinth from the given drawing.
-
May 2015 Work out the quantity of mud masonry in foundation and plinth from the given drawing.
-
Dec 2008 Work out the quantities of excavation for foundation for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of lime concrete in foundation for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of mud masonry in foundation and plinth for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of mud masonry in super structure for a room as shown in Figure 1.
-
May 2007 Work out quantities of excavation for foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of CC in foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of brick work in foundation and plinth in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
-
Find out the quantity of earth work for 1500 m length of a channel with the given data: Bed level at R.D. 0 = 237.50 m; Bed width = 4.0 m; Free board = 45 cm; Bank width on both sides = 1.50 m; Side slope in cutting = 1:1; Side slope in filling = 1.5:1 (H:V); Bed slope = 1 in 5000; R.D. (m): 0, 500, 1000, 1500; Ground level: 237.90, 237.80, 237.60, 237.40.Long Answer 12 Marks May-2007 • PSBTE DIPLOMA
-
May 2016 Work out the quantities of earthwork for a channel from the given data: RD 0 500 1000 1500; GL 341.400 341.300 341.100 340.900; PBL = 340.800 m, bed width 4 m, side slope in cutting 1:1 and in filling 1.5:1, bank width 1.5 m on both sides. FSD is 60 cm, free board is 45 cm. Bed slope is 1 in 5000.
-
May 2008 Calculate the quantity of earthwork for a canal having the given data: RD 0, 250, 500, 750, 1000; NSL 220.50, 220.30, 220.50, 220.15, 220.05; bed width = 3 m; F.S.D. = 0.75 m; F.B. = 0.45 m; top width of banks = 1.5 m; side slope in banking = 1.5:1; side slope in cutting = 1:1; bed slope = 1 in 5000; R.L. of bed at Rd 0 = 220.00.
-
Dec 2008 Calculate the quantities of earth work for a portion of channel from the following data: Bed width = 5 m, Full supply depth = 0.6 m, Free board = 0.5 m, Bed slope = 1 in 5000. Rd/GL/Proposed Bed Level: 0/241.60/241.00, 500/241.50, 1000/241.30, 1500/241.10.
-
-
Give the unit of measurement for surface dressing.Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
-
Give the unit of measurement for puddling.Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
-
Give the unit of measurement for honey comb brick work.Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
-
May 2022 State the Units of Measurement for Brick work.
-
May 2022 State the unit of measurement for Brick Work.
-
May 2019 State the unit of measurement for Brick Work.
-
Dec 2017 State the units of measurement for brick work in foundation.
-
Dec 2017 State the units of measurement for ashlar masonry.
-
Dec 2016 State the Units of Measurement of brick work.
-
Dec 2015 State the units of measurements for brick work.
-
-
Give the unit of measurement for cut stone work in Jali.Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
-
Dec 2008 Write the units of measurement and payment for cut stone work in jali.
-
-
Give the unit of measurement for G.I. sheet roofing.Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
-
Give the unit of measurement for cement pointing.Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
-
May 2008 Give the unit of measurement and unit of payment for cement pointing.
-
-
Give the unit of measurement for sawing of timber.Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
-
May 2017 State the unit of measurement for supply of timber.
-
May 2008 Give the unit of measurement and unit of payment for supply of timber.
-
Dec 2008 Write the units of measurement and payment for sawing of timber.
-
-
Give the unit of measurement for well sinking.Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
-
Give the unit of measurement for welding.Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
-
May 2019 State the unit of measurement for Welding.
-
May 2017 State the unit of measurement for welding.
-
Dec 2016 State the Units of Measurement of welding.
-
-
Give the unit of measurement for steel work.Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
-
May 2022 State the unit of measurement for Steel work.
-
May 2019 State the unit of measurement for Steel work.
-
May 2017 State the unit of measurement for steel work.
-
May 2016 State the units of measurements and payment for Steel.
-
May 2015 State the unit of measurement for Steelwork.
-
Dec 2015 State the units of measurements for steel work.
-
-
Give the unit of measurement for dag belling.Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
-
Give the unit of measurement for glass panes supply.Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
-
May 2017 State the unit of measurement for glass panes.
-
May 2015 State the unit of measurement for Glass Panes.
-
-
What are the essential elements of a control? Explain briefly.Long Answer 6 Marks May-2007 • PSBTE DIPLOMA
-
Give the advantages and disadvantages of item rate contract.Long Answer 6 Marks May-2007 • PSBTE DIPLOMA
-
May 2008 Give the advantages and disadvantages of item rate contract.
-
-
Differentiate between preliminary estimate and detailed estimate.Long Answer 6 Marks May-2007 • PSBTE DIPLOMA
-
May 2017 Distinguish clearly between preliminary estimate and detailed estimate.
-
May 2015 Distinguish clearly between preliminary estimate and detailed estimate.
-
-
What is the purpose of valuation?Long Answer 6 Marks May-2007 • PSBTE DIPLOMA
-
May 2022 What is Valuation? Write down the purpose of Valuation.
-
May 2020 What is Valuation? Write down the purpose of Valuation.
-
May 2019 What is valuation? Give the purpose of valuation.
-
May 2018
Define valuation. Give the purpose of valuation
-
Dec 2018
What is Valuation? Write down the purpose of Valuation.
-
May 2017 Define valuation. Give the purpose of valuation. State and explain the various methods of valuation.
-
May 2016 Write short note on Purpose of valuation.
-
Dec 2016 What is valuation? Give the purpose of valuation.
-
May 2015 Define valuation. Give the purpose of valuation. State and explain the various methods of valuation.
-
Dec 2015 What is valuation?
-
Dec 2015 Write down the purpose of valuation.
-
May 2010 Explain the purpose of valuation.
-
Dec 2008 Define valuation and explain purpose of valuation.
-
-
Calculate the quantity of dry materials for 10 cubic metre of brick work laid in cement mortar 1:5 in super structure.Long Answer May-2007 • PSBTE DIPLOMA
-
Calculate the quantity of dry materials for 20 cum of C.C 1:8:16 in foundation.Long Answer May-2007 • PSBTE DIPLOMA
-
Calculate the quantity of earth work of a hill road from RD 400 to RD 700. Formation width = 6 m; side slope in banking = 2:1; side slope in cutting = 1:1; transverse slope = 1 in 5. R.L. of ground and formation level at the center of road are given below: RD 400 N.S.L. 202.25 Formation level 204.25; RD 500 N.S.L. 202.50 Formation level 204.75; RD 600 N.S.L. 203.00 Formation level 203.75; RD 700 N.S.L. 204.10 Formation level 203.50.Long Answer 12 Marks May-2007 • PSBTE DIPLOMA
-
May 2016 Calculate the quantity of earthwork for a hill road from RD 300 to RD 700, partly in cutting and partly in filling. Formation width is 6 m, side slope in banking 2:1 and in cutting 1:1. Transverse slope is 1 in 5. RD 300 400 500 600 700; NSL 202.250 202.500 203.000 204.100 204.800; FL 204.250 204.000 203.750 203.500 203.250.
-
May 2008 Calculate the quantity of earthwork for a hill road with the following data: formation width of road = 6 m; side slope in banking = 2:1; side slope in cutting = 1:1; transverse slope of ground 1 in 6 throughout. NSL of ground and formation levels along the center line of road are given below: R.D. 100, 200, 300, 400; N.SL 202.20, 202.50, 203.00, 203.60; Formation Level 203.20, 203.00, 203.20, 203.60.
-
Explore all data
FAQ
Frequently Asked Questions
Answers about this subject, solved papers, and preparation.
01 Where can I find QSV previous year question papers for Civil Engineering 6th semester?
You can use this page to look for QSV old question papers and previous year papers for PSBTE Diploma in Civil Engineering 6th semester.
02 Is this page for Quantity Surveying and Valuation only?
Yes, this page is focused on QSV, which stands for Quantity Surveying and Valuation, for the 6th semester Civil Engineering course.
03 Can I use these papers for revision before exams?
Yes, previous year papers are helpful for revision, practicing questions, and understanding the exam pattern for QSV.
04 Are these official question papers from PSBTE?
No, BRpaper is not the official website of Punjab State Board of Technical Education. It only helps students find previous year papers and related study material.
05 Do you provide solved QSV question papers?
Some question papers may be available for practice, but this page does not guarantee solved papers for every year.