Solved question paper for QSV May-2007 (DIPLOMA 6th)

Solved Question Paper

Quantity surveying and valuation May-2007

PSBTE • DIPLOMA • Cvil Engineering • 6th • May-2007

QSV (Quantity Surveying and Valuation) for Punjab State Board of Technical Education Diploma in Engineering Civil Engineering 6th semester helps students find subject-wise previous year question papers, old papers, and exam preparation material. These papers are useful for revision, understanding the exam pattern, and spotting repeated question styles before the exam. BRpaper is not the official website of the Punjab State Board of Technical Education or any board or university. Use this page to explore QSV question paper PDFs and old exam papers for better practice and preparation.

Solved Questions

Solved
  1. Work out quantities of excavation for foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
    Long Answer May-2007 • PSBTE DIPLOMA
  2. Work out quantities of CC in foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
    Long Answer May-2007 • PSBTE DIPLOMA
  3. Work out quantities of DRC for a two roomed quarter as per drawing given in figure-1 (overleaf).
    Long Answer May-2007 • PSBTE DIPLOMA
  4. Work out quantities of brick work in foundation and plinth in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
    Long Answer May-2007 • PSBTE DIPLOMA
  5. Work out quantities of brick work in super structure in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
    Long Answer May-2007 • PSBTE DIPLOMA
  6. Find out the quantity of earth work for 1500 m length of a channel with the given data: Bed level at R.D. 0 = 237.50 m; Bed width = 4.0 m; Free board = 45 cm; Bank width on both sides = 1.50 m; Side slope in cutting = 1:1; Side slope in filling = 1.5:1 (H:V); Bed slope = 1 in 5000; R.D. (m): 0, 500, 1000, 1500; Ground level: 237.90, 237.80, 237.60, 237.40.
    Long Answer 12 Marks May-2007 • PSBTE DIPLOMA
  7. Give the unit of measurement for surface dressing.
    Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
  8. Give the unit of measurement for puddling.
    Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
  9. Give the unit of measurement for honey comb brick work.
    Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
  10. Give the unit of measurement for cut stone work in Jali.
    Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
  11. Give the unit of measurement for G.I. sheet roofing.
    Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
  12. Give the unit of measurement for cement pointing.
    Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
  13. Give the unit of measurement for sawing of timber.
    Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
  14. Give the unit of measurement for well sinking.
    Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
  15. Give the unit of measurement for welding.
    Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
  16. Give the unit of measurement for steel work.
    Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
  17. Give the unit of measurement for dag belling.
    Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
  18. Give the unit of measurement for glass panes supply.
    Short Answer 12 Marks May-2007 • PSBTE DIPLOMA
  19. What are the essential elements of a control? Explain briefly.
    Long Answer 6 Marks May-2007 • PSBTE DIPLOMA
  20. Give the advantages and disadvantages of item rate contract.
    Long Answer 6 Marks May-2007 • PSBTE DIPLOMA
  21. Differentiate between preliminary estimate and detailed estimate.
    Long Answer 6 Marks May-2007 • PSBTE DIPLOMA
  22. What is the purpose of valuation?
    Long Answer 6 Marks May-2007 • PSBTE DIPLOMA
  23. Calculate the quantity of dry materials for 10 cubic metre of brick work laid in cement mortar 1:5 in super structure.
    Long Answer May-2007 • PSBTE DIPLOMA
  24. Calculate the quantity of dry materials for 20 cum of C.C 1:8:16 in foundation.
    Long Answer May-2007 • PSBTE DIPLOMA
  25. Calculate the quantity of earth work of a hill road from RD 400 to RD 700. Formation width = 6 m; side slope in banking = 2:1; side slope in cutting = 1:1; transverse slope = 1 in 5. R.L. of ground and formation level at the center of road are given below: RD 400 N.S.L. 202.25 Formation level 204.25; RD 500 N.S.L. 202.50 Formation level 204.75; RD 600 N.S.L. 203.00 Formation level 203.75; RD 700 N.S.L. 204.10 Formation level 203.50.
    Long Answer 12 Marks May-2007 • PSBTE DIPLOMA

Explore all data

FAQ

Frequently Asked Questions

Answers about this subject, solved papers, and preparation.

Updated regularly
01 Where can I find QSV previous year question papers for Civil Engineering 6th semester?

You can use this page to look for QSV old question papers and previous year papers for PSBTE Diploma in Civil Engineering 6th semester.

02 Is this page for Quantity Surveying and Valuation only?

Yes, this page is focused on QSV, which stands for Quantity Surveying and Valuation, for the 6th semester Civil Engineering course.

03 Can I use these papers for revision before exams?

Yes, previous year papers are helpful for revision, practicing questions, and understanding the exam pattern for QSV.

04 Are these official question papers from PSBTE?

No, BRpaper is not the official website of Punjab State Board of Technical Education. It only helps students find previous year papers and related study material.

05 Do you provide solved QSV question papers?

Some question papers may be available for practice, but this page does not guarantee solved papers for every year.