Solved question paper for QSV May-2015 (DIPLOMA 6th)
Solved Question Paper
Quantity surveying and valuation May-2015
PSBTE • DIPLOMA • Cvil Engineering • 6th • May-2015
QSV (Quantity Surveying and Valuation) for Punjab State Board of Technical Education Diploma in Engineering Civil Engineering 6th semester helps students find subject-wise previous year question papers, old papers, and exam preparation material. These papers are useful for revision, understanding the exam pattern, and spotting repeated question styles before the exam. BRpaper is not the official website of the Punjab State Board of Technical Education or any board or university. Use this page to explore QSV question paper PDFs and old exam papers for better practice and preparation.
Solved Questions
Solved-
Number of bricks required for 1 cu.m brick masonry is _________.Fill in the Blanks 1 Marks May-2015 • PSBTE DIPLOMA
-
May 2022 How many bricks are required for 1 cu.m Brick Masonry?
-
May 2019 Number of bricks required for 1 Cu.m brick masonry is ______.
-
Dec 2018
Fill in the blanks.
\r\n\r\ni. No. of bricks for 1 cu.m Brick Masonry is ________.
-
May 2017 Number of bricks required for 1 cu.m brick masonry is __________.
-
Dec 2017 No. of bricks in 1 cum of brick masonry is __________
-
Dec 2015 Number of bricks required for 1 cum. brick masonry is __________.
-
-
Capitalized value = net annual rent × _________.Fill in the Blanks 1 Marks May-2015 • PSBTE DIPLOMA
-
May 2022 Capitalized value = net annual rent × Year’s Purchase
-
May 2019 Capitalized value = net annual rent × _______.
-
-
An agreement which is enforceable by law is a _________.Fill in the Blanks 1 Marks May-2015 • PSBTE DIPLOMA
-
A reasonable profit usually ________% for contractor is included in the analysis of rates.Fill in the Blanks 1 Marks May-2015 • PSBTE DIPLOMA
-
May 2022 A reasonable profit usually 15% for contractor is included in the analysis of rates.
-
May 2019 A reasonable profit usually ____ % for contractor is included in the analysis of rates.
-
May 2018
While analyzing the rates, contractor profit is added at the rate of………………%.
-
-
Dry material required for 1 cu.m cement concrete is _________ cu.m.Fill in the Blanks 1 Marks May-2015 • PSBTE DIPLOMA
-
May 2022 Find out the Dry Materials required for 1 cu.m Cement Concrete 1:1.5:3.
-
May 2020 Find out the Dry Materials required for 1 cu.m Cement Concrete 1:2:4.
-
May 2019 Find out the dry material required for 1 cu.m cement concrete 1:2:4.
-
May 2018
Find out the dry material required for 1cu.m cement concrete 1:4:8
-
Dec 2018
Find out the Dry Materials required for 1 cu.m Cement Concrete 1:2:4
-
May 2017 Find out the dry material required for 1 cu.m cement concrete 1:2:4.
-
Dec 2017 Find out the dry material required for 10 cum cement concrete 1:2:4.
-
May 2015 Find out the dry material required for 100 cu.m cement concrete 1:2:4.
-
-
State the unit of measurement for Earthwork.Short Answer 1 Marks May-2015 • PSBTE DIPLOMA
-
May 2022 State the Units of Measurement for Earthwork.
-
May 2019 State the unit of measurement for Earthwork.
-
Dec 2017 State the units of measurement for earthwork.
-
May 2016 State the units of measurements and payment for Earthwork.
-
Dec 2015 State the units of measurements for earth work.
-
-
State the unit of measurement for Steelwork.Short Answer 1 Marks May-2015 • PSBTE DIPLOMA
-
May 2022 State the unit of measurement for Steel work.
-
May 2019 State the unit of measurement for Steel work.
-
May 2017 State the unit of measurement for steel work.
-
May 2016 State the units of measurements and payment for Steel.
-
Dec 2015 State the units of measurements for steel work.
-
May 2007 Give the unit of measurement for steel work.
-
-
State the unit of measurement for Painting.Short Answer 1 Marks May-2015 • PSBTE DIPLOMA
-
May 2022 State the unit of measurement for Painting.
-
Dec 2017 State the units of measurement for painting.
-
Dec 2015 State the units of measurements for painting.
-
-
State the unit of measurement for D.P.C.Short Answer 1 Marks May-2015 • PSBTE DIPLOMA
-
May 2019 State the unit of measurement for D.P.C.
-
Dec 2017 State the units of measurement for DPC.
-
Dec 2016 State the Units of Measurement of D.P.C.
-
-
State the unit of measurement for Drip course.Short Answer 1 Marks May-2015 • PSBTE DIPLOMA
-
Dec 2015 State the units of measurements for drip course.
-
-
State the unit of measurement for Doors & Windows.Short Answer 1 Marks May-2015 • PSBTE DIPLOMA
-
Dec 2017 State the units of measurement for wood work in door frames.
-
Dec 2016 State the Units of Measurement of doors and windows.
-
-
State the unit of measurement for Electricity Fitting.Short Answer 1 Marks May-2015 • PSBTE DIPLOMA
-
May 2019 State the unit of measurement for Electric Fitting.
-
May 2018
State the unit of measurement for the following:-
\r\n\r\nvi. Electric Fitting xi. D.P.C
-
-
State the unit of measurement for Bitumen Road Surfacing.Short Answer 1 Marks May-2015 • PSBTE DIPLOMA
-
State the unit of measurement for Water Closet.Short Answer 1 Marks May-2015 • PSBTE DIPLOMA
-
May 2008 Give the unit of measurement and unit of payment for water closet.
-
-
State the unit of measurement for Glass Panes.Short Answer 1 Marks May-2015 • PSBTE DIPLOMA
-
May 2017 State the unit of measurement for glass panes.
-
May 2007 Give the unit of measurement for glass panes supply.
-
-
Define an estimate. Give its importance or objectives. Name the various types of estimate.Long Answer 5 Marks May-2015 • PSBTE DIPLOMA
-
May 2019 Define an estimate. Give its importance or objectives. Name the various types of estimate.
-
May 2017 Define an estimate. Give its importance or objectives. Name the various types of estimate.
-
-
Write a note on analysis of rates.Long Answer 5 Marks May-2015 • PSBTE DIPLOMA
-
May 2017 Write a note on analyses of rates.
-
May 2016 Write short note on Analysis of rates.
-
May 2010 Write a note on the steps involved in the analysis of rates.
-
-
Find out the dry material for 100 cu.m brick masonry in cement sand mortar 1:5.Long Answer 5 Marks May-2015 • PSBTE DIPLOMA
-
May 2022 Find out the Dry Materials required for 1 cu.m Brick Masonry in Cement Mortar 1:5 in Foundation.
-
May 2022 Find dry materials required for 5m³ brick masonry in cement mortar 1:4.
-
May 2020 Find out the Dry Materials required for 1 cu.m Brick Masonry in Cement Mortar 1:5.
-
May 2019 Find out the dry material for 1 cu.m brick masonry in cement sand mortar 1:5.
-
May 2018
Find out the dry material for 1cu.m brick masonry in cement sand mortar 1:4.
-
May 2017 Find out the dry material for 1 cu.m brick masonry in cement sand mortar 1:5.
-
Dec 2015 Find out dry material required for 1 cum. brick masonry in cement mortar 1:5.
-
-
Find out the dry material required for 100 cu.m cement concrete 1:2:4.Long Answer 5 Marks May-2015 • PSBTE DIPLOMA
-
May 2022 Find out the Dry Materials required for 1 cu.m Cement Concrete 1:1.5:3.
-
May 2020 Find out the Dry Materials required for 1 cu.m Cement Concrete 1:2:4.
-
May 2019 Find out the dry material required for 1 cu.m cement concrete 1:2:4.
-
May 2018
Find out the dry material required for 1cu.m cement concrete 1:4:8
-
Dec 2018
Find out the Dry Materials required for 1 cu.m Cement Concrete 1:2:4
-
May 2017 Find out the dry material required for 1 cu.m cement concrete 1:2:4.
-
Dec 2017 Find out the dry material required for 10 cum cement concrete 1:2:4.
-
May 2015 Dry material required for 1 cu.m cement concrete is _________ cu.m.
-
-
Explain the principles of valuation.Long Answer 5 Marks May-2015 • PSBTE DIPLOMA
-
Dec 2018
Explain in detail the various methods of Valuation
-
May 2017 Explain the principles of valuation.
-
-
Define contractor. What are the essential qualifications of a contractor?Long Answer 5 Marks May-2015 • PSBTE DIPLOMA
-
May 2022 What are the qualities and responsibilities of contractor?
-
May 2019 Define contractor. What are essential qualifications of a contractor?
-
May 2017 Define contractor. What are essential qualifications of a contractor?
-
Dec 2015 What is contractor?
-
-
Distinguish clearly between preliminary estimate and detailed estimate.Long Answer 5 Marks May-2015 • PSBTE DIPLOMA
-
May 2017 Distinguish clearly between preliminary estimate and detailed estimate.
-
May 2007 Differentiate between preliminary estimate and detailed estimate.
-
-
Write a short note on depreciation of buildings.Long Answer 5 Marks May-2015 • PSBTE DIPLOMA
-
May 2020 Write a short note on Depreciation of Buildings and different types of Building Estimates.
-
May 2019 Write a short note on Depreciation and Muster Roll.
-
Dec 2018
Write a short note on Depreciation of Buildings and different types of Building Estimates.
-
May 2017 Write a short note on depreciation of buildings.
-
Dec 2017 Write a short note on depreciation.
-
May 2016 Write short note on Depreciation.
-
-
Differentiate between security deposit and retention money.Long Answer 5 Marks May-2015 • PSBTE DIPLOMA
-
Prepare a preliminary estimate of a building having plinth area equal to 1600 sq.m. Given that plinth area rate is Rs. 2000/- per sq.m; extra for architectural work is 1.5% of the building cost; extra for electrical installation (10%) plus water supply and sanitary installations (6%) = 16% of the building cost; extra for other services is 8% of the building cost; contingencies and supervision charges are 10%.Long Answer 10 Marks May-2015 • PSBTE DIPLOMA
-
May 2019 Prepare a preliminary estimate of a building having plinth area equal to 2000 sq.m. Given that: Plinth area rate – Rs. 2500/- per sq.; Extra for Architectural work - 1½% of the building cost; Extra for Electrical Installation (10%) + Water supply and sanitary installations (6%) = 16% of the building cost; Extra for other services - 8% of the building cost; Contingencies and supervision charges 10%.
-
May 2017 Prepare a preliminary estimate of a building having plinth area equal to 2000 sq.m. Given that plinth area rate is Rs. 2100/- per sq. m; extra for architectural work is 1.5% of the building cost; extra for electrical installation (10%) and water supply and sanitary installations (6%) = 16% of the building cost; extra for other services is 8% of the building cost; contingencies and supervision charges are 10%.
-
-
Work out the analysis of rates for cement concrete 1:4:8 in foundation. Labour for 10 cu.m cement concrete is 1 mason @ Rs. 500/- per day, 15 mazdor @ Rs. 300/- per day, 2 bhisti @ Rs. 250/- per day. Rate of material: cement bag Rs. 250/-, sand Rs. 600/- per cu.m, course aggregate (bazri) Rs. 1000/- per cu.m.Long Answer 10 Marks May-2015 • PSBTE DIPLOMA
-
May 2022 Work out the analyses of rate for cement concrete 1:2:4 in slab. Labour for 10m³ cement concrete is 1 mason @ 450 Rs/day, 15 mazdoor @ 300 Rs/day, 2 Bhisti @ 200 Rs/day. Rate of material: cement bag Rs. 390/-, sand Rs. 850/- per m³. (Assume any missing data)
-
May 2020 Prepare the Analysis of Rate for 10 cu.m of Cement Concrete 1:2:4 from the following data: Labour for 10 cu.m Mason: 1 no. @ Rs. 300 per day; Labour: 15 no. @ Rs. 200 per day; Water Man: 2 no. @ Rs. 250 per day. Cost of Material Cement: Rs. 300 per Bag; Sand: Rs. 600 per cu.m; Bajri: Rs. 1200 per cu.m.
-
Dec 2018
Prepare the Analysis of Rate for 10 cu.m of Cement Concrete 1:2:4 from the following data:
\r\n\r\nLabour for 10 cu.m : Mason: 1 no. @Rs. 300 per day
\r\n\r\nLabour: 15 no. @Rs. 200 per day
\r\n\r\nWater Man: 2 no. @ Rs. 250 per day
\r\n\r\nCost of Material Cement: Rs. 300 per Bag
\r\n\r\nSand: Rs. 600 per cu.m
\r\n\r\nBajri: Rs. 1200 per cu.m.
-
May 2017 Work out the analyses of rates for cement concrete 1:4:8 in foundation. Labour for 10 cu.m cement concrete is 1 mason @ Rs. 450/- per day, 15 mazdoor @ Rs. 250/- per day, 2 bhisti @ Rs. 200/- per day. Rate of material: cement bag Rs. 300/-, sand Rs. 800/- per cu.m, coarse aggregate (bazri) Rs. 1000/- per cu.m.
-
May 2016 Prepare the analysis of rate for 10 cum of cement concrete 1:2:4 from the given data: labour for 10 cum; Mason = 1 @ Rs. 300 per day, Labour = 15 @ Rs. 200 per day, Water man = 2 @ Rs. 250 per day. Cost of material: Cement = Rs. 300 per bag, Sand = Rs. 600 per cum, Bajri = Rs. 1200 per cum.
-
Dec 2016 Work out the analyses of rate for cement concrete 1:2:4 in slab. Labour for 10 cum cement concrete is 1 mason @ 450 Rs/day, 15 mazdoor @ 300 Rs/day, 2 bhisti @ 200 Rs/day. (Assume any other required data).
-
-
Define valuation. Give the purpose of valuation. State and explain the various methods of valuation.Long Answer 10 Marks May-2015 • PSBTE DIPLOMA
-
May 2022 What is Valuation? Write down the purpose of Valuation.
-
May 2020 What is Valuation? Write down the purpose of Valuation.
-
May 2019 What is valuation? Give the purpose of valuation.
-
May 2018
Define valuation. Give the purpose of valuation
-
Dec 2018
What is Valuation? Write down the purpose of Valuation.
-
May 2017 Define valuation. Give the purpose of valuation. State and explain the various methods of valuation.
-
May 2016 Write short note on Purpose of valuation.
-
Dec 2016 What is valuation? Give the purpose of valuation.
-
Dec 2015 What is valuation?
-
Dec 2015 Write down the purpose of valuation.
-
May 2010 Explain the purpose of valuation.
-
Dec 2008 Define valuation and explain purpose of valuation.
-
May 2007 What is the purpose of valuation?
-
-
What is contract? Explain the different types of contract.Long Answer 10 Marks May-2015 • PSBTE DIPLOMA
-
May 2022 Explain different types of Contracts.
-
May 2022 What is meaning of Contract? Explain.
-
May 2020 Define Contract and explain it’s different types.
-
May 2019 What is contract? Explain the different type of contract.
-
May 2018
Define Contract? What are the essential elements of contracts?
-
Dec 2018
Define Contract and explain its different types
-
May 2017 What is contract? Explain the different type of contract.
-
Dec 2017 What is contract? Explain different types of contract.
-
Dec 2015 Define contract and explain different types of contracts.
-
May 2010 What is a contract? Explain its basic elements.
-
-
Work out the cost of earth work for a portion of a road from Rd 0 to Rd 90 meters from the following data: Rd 0 = 205.00, Rd 30 = 205.00, Rd 60 = 206.00, Rd 90 = 206.00, filling or banking level = 210.00. The formation is in a downward gradient of 1 in 30. Formation width is 10 meters and side slope is 2:1 (Horizontal:Vertical). Rate of earthwork is Rs. 400.00 per cu.m.Long Answer 10 Marks May-2015 • PSBTE DIPLOMA
-
May 2019 Work out the cost of earth work for a portion of a road from Rd 0 to Rd 90 meters from the following data: Rd, N.S. level, Formation level: 0 - 205.00 - 210.00; 30 - 205.60 - ; 60 - 206.00 - ; 90 - 206.80 - ; The formation is in a downward gradient of 1 in 30. Formation width is 10 meters and side slope 2:1 (Horizontal: Vertical). Rate of earthwork is Rs. 400.00% cu.m.
-
May 2017 Work out the cost of earth work for a portion of a road from Rd 0 to Rd 90 meters from the following data: Rd 0, 30, 60, 90; N.S. levels 205.00, 205.60, 206.10, 206.90; formation in a downward gradient of 1 in 30; formation width 10 meters; side slope 2:1 (horizontal: vertical); rate of earthwork Rs. 425.00 per cu.m.
-
-
Work out the quantity of excavation for foundation from the given drawing.Long Answer 10 Marks May-2015 • PSBTE DIPLOMA
-
May 2022 Work out the Quantities of Excavation for Foundation from the given Drawing (Wall thickness-0.30 m all around).
-
May 2017 Work out the quantity of excavation for foundation from the given drawing.
-
May 2016 Calculate the quantities of excavation for foundation from the sketch attached.
-
Dec 2016 Work out the quantities of excavation for foundation from the given drawing.
-
-
Work out the quantity of cement concrete 1:6:18 in foundation from the given drawing.Long Answer 10 Marks May-2015 • PSBTE DIPLOMA
-
May 2022 Work out the Quantities of P.C.C in Foundation (1:6:18) from the given Drawing (Wall thickness-0.30 m all around).
-
May 2017 Work out the quantity of cement concrete 1:6:18 in foundation from the given drawing.
-
Dec 2016 Work out the quantities of cement concrete 1:6:18 in foundation from the given drawing.
-
-
Work out the quantity of mud masonry in foundation and plinth from the given drawing.Long Answer 10 Marks May-2015 • PSBTE DIPLOMA
-
May 2022 Work out the Quantities of Mud Masonry in Foundation and Plinth from the given Drawing (Wall thickness-0.30 m all around).
-
May 2017 Work out the quantity of mud masonry in foundation and plinth from the given drawing.
-
Dec 2016 Work out the quantities of brick masonry in foundation and plinth from the given drawing.
-
Dec 2008 Work out the quantities of excavation for foundation for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of lime concrete in foundation for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of mud masonry in foundation and plinth for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of mud masonry in super structure for a room as shown in Figure 1.
-
May 2007 Work out quantities of excavation for foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of CC in foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of brick work in foundation and plinth in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of brick work in super structure in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
-
Work out the quantity of mud masonry in super structure from the given drawing.Long Answer 10 Marks May-2015 • PSBTE DIPLOMA
-
May 2022 Work out the Quantities of Mud Masonry in Superstructure from the given Drawing (Wall thickness-0.30 m all around).
-
May 2017 Work out the quantity of mud masonry in super structure from the given drawing.
-
Explore all data
FAQ
Frequently Asked Questions
Answers about this subject, solved papers, and preparation.
01 Where can I find QSV previous year question papers for Civil Engineering 6th semester?
You can use this page to look for QSV old question papers and previous year papers for PSBTE Diploma in Civil Engineering 6th semester.
02 Is this page for Quantity Surveying and Valuation only?
Yes, this page is focused on QSV, which stands for Quantity Surveying and Valuation, for the 6th semester Civil Engineering course.
03 Can I use these papers for revision before exams?
Yes, previous year papers are helpful for revision, practicing questions, and understanding the exam pattern for QSV.
04 Are these official question papers from PSBTE?
No, BRpaper is not the official website of Punjab State Board of Technical Education. It only helps students find previous year papers and related study material.
05 Do you provide solved QSV question papers?
Some question papers may be available for practice, but this page does not guarantee solved papers for every year.