Solved question paper for QSV May-2016 (DIPLOMA 6th)
Solved Question Paper
Quantity surveying and valuation May-2016
PSBTE • DIPLOMA • Cvil Engineering • 6th • May-2016
QSV (Quantity Surveying and Valuation) for Punjab State Board of Technical Education Diploma in Engineering Civil Engineering 6th semester helps students find subject-wise previous year question papers, old papers, and exam preparation material. These papers are useful for revision, understanding the exam pattern, and spotting repeated question styles before the exam. BRpaper is not the official website of the Punjab State Board of Technical Education or any board or university. Use this page to explore QSV question paper PDFs and old exam papers for better practice and preparation.
Solved Questions
Solved-
State the units of measurements and payment for Earthwork.Very Short Answer 2 Marks May-2016 • PSBTE DIPLOMA
-
May 2022 State the Units of Measurement for Earthwork.
-
May 2019 State the unit of measurement for Earthwork.
-
Dec 2017 State the units of measurement for earthwork.
-
May 2015 State the unit of measurement for Earthwork.
-
Dec 2015 State the units of measurements for earth work.
-
-
State the units of measurements and payment for RCC work.Very Short Answer 2 Marks May-2016 • PSBTE DIPLOMA
-
Dec 2015 State the units of measurements for R.C.C. works.
-
-
State the units of measurements and payment for Steel.Very Short Answer 2 Marks May-2016 • PSBTE DIPLOMA
-
May 2022 State the unit of measurement for Steel work.
-
May 2019 State the unit of measurement for Steel work.
-
May 2017 State the unit of measurement for steel work.
-
May 2015 State the unit of measurement for Steelwork.
-
Dec 2015 State the units of measurements for steel work.
-
May 2007 Give the unit of measurement for steel work.
-
-
State the units of measurements and payment for Half brick wall.Very Short Answer 2 Marks May-2016 • PSBTE DIPLOMA
-
May 2017 State the unit of measurement for half brick wall.
-
Dec 2017 Units of measurement of brick wall is __________
-
-
State the units of measurements and payment for Holdfast.Very Short Answer 2 Marks May-2016 • PSBTE DIPLOMA
-
State the units of measurements and payment for DPC.Very Short Answer 2 Marks May-2016 • PSBTE DIPLOMA
-
State the units of measurements and payment for Flooring.Very Short Answer 2 Marks May-2016 • PSBTE DIPLOMA
-
May 2022 State the Units of Measurement for Flooring.
-
May 2019 State the unit of measurement for Flooring.
-
May 2017 State the unit of measurement for flooring.
-
Dec 2017 State the units of measurement for concrete flooring.
-
Dec 2015 State the units of measurements for flooring.
-
-
Calculate the quantity of earthwork for a hill road from RD 300 to RD 700, partly in cutting and partly in filling. Formation width is 6 m, side slope in banking 2:1 and in cutting 1:1. Transverse slope is 1 in 5. RD 300 400 500 600 700; NSL 202.250 202.500 203.000 204.100 204.800; FL 204.250 204.000 203.750 203.500 203.250.Long Answer 13 Marks May-2016 • PSBTE DIPLOMA
-
May 2008 Calculate the quantity of earthwork for a hill road with the following data: formation width of road = 6 m; side slope in banking = 2:1; side slope in cutting = 1:1; transverse slope of ground 1 in 6 throughout. NSL of ground and formation levels along the center line of road are given below: R.D. 100, 200, 300, 400; N.SL 202.20, 202.50, 203.00, 203.60; Formation Level 203.20, 203.00, 203.20, 203.60.
-
May 2007 Calculate the quantity of earth work of a hill road from RD 400 to RD 700. Formation width = 6 m; side slope in banking = 2:1; side slope in cutting = 1:1; transverse slope = 1 in 5. R.L. of ground and formation level at the center of road are given below: RD 400 N.S.L. 202.25 Formation level 204.25; RD 500 N.S.L. 202.50 Formation level 204.75; RD 600 N.S.L. 203.00 Formation level 203.75; RD 700 N.S.L. 204.10 Formation level 203.50.
-
-
Work out the quantities of earthwork for a channel from the given data: RD 0 500 1000 1500; GL 341.400 341.300 341.100 340.900; PBL = 340.800 m, bed width 4 m, side slope in cutting 1:1 and in filling 1.5:1, bank width 1.5 m on both sides. FSD is 60 cm, free board is 45 cm. Bed slope is 1 in 5000.Long Answer 13 Marks May-2016 • PSBTE DIPLOMA
-
May 2008 Calculate the quantity of earthwork for a canal having the given data: RD 0, 250, 500, 750, 1000; NSL 220.50, 220.30, 220.50, 220.15, 220.05; bed width = 3 m; F.S.D. = 0.75 m; F.B. = 0.45 m; top width of banks = 1.5 m; side slope in banking = 1.5:1; side slope in cutting = 1:1; bed slope = 1 in 5000; R.L. of bed at Rd 0 = 220.00.
-
Dec 2008 Calculate the quantities of earth work for a portion of channel from the following data: Bed width = 5 m, Full supply depth = 0.6 m, Free board = 0.5 m, Bed slope = 1 in 5000. Rd/GL/Proposed Bed Level: 0/241.60/241.00, 500/241.50, 1000/241.30, 1500/241.10.
-
May 2007 Find out the quantity of earth work for 1500 m length of a channel with the given data: Bed level at R.D. 0 = 237.50 m; Bed width = 4.0 m; Free board = 45 cm; Bank width on both sides = 1.50 m; Side slope in cutting = 1:1; Side slope in filling = 1.5:1 (H:V); Bed slope = 1 in 5000; R.D. (m): 0, 500, 1000, 1500; Ground level: 237.90, 237.80, 237.60, 237.40.
-
-
Prepare the analysis of rate for 10 cum of cement concrete 1:2:4 from the given data: labour for 10 cum; Mason = 1 @ Rs. 300 per day, Labour = 15 @ Rs. 200 per day, Water man = 2 @ Rs. 250 per day. Cost of material: Cement = Rs. 300 per bag, Sand = Rs. 600 per cum, Bajri = Rs. 1200 per cum.Long Answer 13 Marks May-2016 • PSBTE DIPLOMA
-
May 2022 Work out the analyses of rate for cement concrete 1:2:4 in slab. Labour for 10m³ cement concrete is 1 mason @ 450 Rs/day, 15 mazdoor @ 300 Rs/day, 2 Bhisti @ 200 Rs/day. Rate of material: cement bag Rs. 390/-, sand Rs. 850/- per m³. (Assume any missing data)
-
May 2020 Prepare the Analysis of Rate for 10 cu.m of Cement Concrete 1:2:4 from the following data: Labour for 10 cu.m Mason: 1 no. @ Rs. 300 per day; Labour: 15 no. @ Rs. 200 per day; Water Man: 2 no. @ Rs. 250 per day. Cost of Material Cement: Rs. 300 per Bag; Sand: Rs. 600 per cu.m; Bajri: Rs. 1200 per cu.m.
-
Dec 2018
Prepare the Analysis of Rate for 10 cu.m of Cement Concrete 1:2:4 from the following data:
\r\n\r\nLabour for 10 cu.m : Mason: 1 no. @Rs. 300 per day
\r\n\r\nLabour: 15 no. @Rs. 200 per day
\r\n\r\nWater Man: 2 no. @ Rs. 250 per day
\r\n\r\nCost of Material Cement: Rs. 300 per Bag
\r\n\r\nSand: Rs. 600 per cu.m
\r\n\r\nBajri: Rs. 1200 per cu.m.
-
May 2017 Work out the analyses of rates for cement concrete 1:4:8 in foundation. Labour for 10 cu.m cement concrete is 1 mason @ Rs. 450/- per day, 15 mazdoor @ Rs. 250/- per day, 2 bhisti @ Rs. 200/- per day. Rate of material: cement bag Rs. 300/-, sand Rs. 800/- per cu.m, coarse aggregate (bazri) Rs. 1000/- per cu.m.
-
Dec 2016 Work out the analyses of rate for cement concrete 1:2:4 in slab. Labour for 10 cum cement concrete is 1 mason @ 450 Rs/day, 15 mazdoor @ 300 Rs/day, 2 bhisti @ 200 Rs/day. (Assume any other required data).
-
May 2015 Work out the analysis of rates for cement concrete 1:4:8 in foundation. Labour for 10 cu.m cement concrete is 1 mason @ Rs. 500/- per day, 15 mazdor @ Rs. 300/- per day, 2 bhisti @ Rs. 250/- per day. Rate of material: cement bag Rs. 250/-, sand Rs. 600/- per cu.m, course aggregate (bazri) Rs. 1000/- per cu.m.
-
-
Write short note on Contract system.Short Answer May-2016 • PSBTE DIPLOMA
-
Write short note on Tender document.Short Answer May-2016 • PSBTE DIPLOMA
-
May 2010 Write short notes on tender form.
-
-
Write short note on Purpose of valuation.Short Answer May-2016 • PSBTE DIPLOMA
-
May 2022 What is Valuation? Write down the purpose of Valuation.
-
May 2020 What is Valuation? Write down the purpose of Valuation.
-
May 2019 What is valuation? Give the purpose of valuation.
-
May 2018
Define valuation. Give the purpose of valuation
-
Dec 2018
What is Valuation? Write down the purpose of Valuation.
-
May 2017 Define valuation. Give the purpose of valuation. State and explain the various methods of valuation.
-
Dec 2016 What is valuation? Give the purpose of valuation.
-
May 2015 Define valuation. Give the purpose of valuation. State and explain the various methods of valuation.
-
Dec 2015 What is valuation?
-
Dec 2015 Write down the purpose of valuation.
-
May 2010 Explain the purpose of valuation.
-
Dec 2008 Define valuation and explain purpose of valuation.
-
May 2007 What is the purpose of valuation?
-
-
Write short note on Depreciation.Short Answer May-2016 • PSBTE DIPLOMA
-
May 2020 Write a short note on Depreciation of Buildings and different types of Building Estimates.
-
May 2019 Write a short note on Depreciation and Muster Roll.
-
Dec 2018
Write a short note on Depreciation of Buildings and different types of Building Estimates.
-
May 2017 Write a short note on depreciation of buildings.
-
Dec 2017 Write a short note on depreciation.
-
May 2015 Write a short note on depreciation of buildings.
-
-
Write short note on Analysis of rates.Short Answer May-2016 • PSBTE DIPLOMA
-
May 2017 Write a note on analyses of rates.
-
May 2015 Write a note on analysis of rates.
-
May 2010 Write a note on the steps involved in the analysis of rates.
-
-
Explain in details the different type of estimates.Long Answer May-2016 • PSBTE DIPLOMA
-
May 2016 Explain the different methods of building estimates.
-
Dec 2015 Explain the various types of estimates.
-
-
Explain the different methods of building estimates.Long Answer May-2016 • PSBTE DIPLOMA
-
May 2016 Explain in details the different type of estimates.
-
Dec 2015 Explain the various types of estimates.
-
-
Calculate the quantities of excavation for foundation from the sketch attached.Long Answer 5 Marks May-2016 • PSBTE DIPLOMA
-
May 2022 Work out the Quantities of Excavation for Foundation from the given Drawing (Wall thickness-0.30 m all around).
-
May 2017 Work out the quantity of excavation for foundation from the given drawing.
-
Dec 2016 Work out the quantities of excavation for foundation from the given drawing.
-
May 2015 Work out the quantity of excavation for foundation from the given drawing.
-
-
Calculate the quantities of 1st class brick masonry from foundation and super structure from the sketch attached.Long Answer 7 Marks May-2016 • PSBTE DIPLOMA
-
Calculate the quantities of cement plaster inside only from the sketch attached.Long Answer 5 Marks May-2016 • PSBTE DIPLOMA
-
Calculate the quantities of 4 cm thick DPC from the sketch attached.Long Answer 5 Marks May-2016 • PSBTE DIPLOMA
Explore all data
FAQ
Frequently Asked Questions
Answers about this subject, solved papers, and preparation.
01 Where can I find QSV previous year question papers for Civil Engineering 6th semester?
You can use this page to look for QSV old question papers and previous year papers for PSBTE Diploma in Civil Engineering 6th semester.
02 Is this page for Quantity Surveying and Valuation only?
Yes, this page is focused on QSV, which stands for Quantity Surveying and Valuation, for the 6th semester Civil Engineering course.
03 Can I use these papers for revision before exams?
Yes, previous year papers are helpful for revision, practicing questions, and understanding the exam pattern for QSV.
04 Are these official question papers from PSBTE?
No, BRpaper is not the official website of Punjab State Board of Technical Education. It only helps students find previous year papers and related study material.
05 Do you provide solved QSV question papers?
Some question papers may be available for practice, but this page does not guarantee solved papers for every year.