Solved question paper for QSV May-2017 (DIPLOMA 6th)
Solved Question Paper
Quantity surveying and valuation May-2017
PSBTE • DIPLOMA • Cvil Engineering • 6th • May-2017
QSV (Quantity Surveying and Valuation) for Punjab State Board of Technical Education Diploma in Engineering Civil Engineering 6th semester helps students find subject-wise previous year question papers, old papers, and exam preparation material. These papers are useful for revision, understanding the exam pattern, and spotting repeated question styles before the exam. BRpaper is not the official website of the Punjab State Board of Technical Education or any board or university. Use this page to explore QSV question paper PDFs and old exam papers for better practice and preparation.
Solved Questions
Solved-
The attendance of the laborers is recorded daily in __________.Fill in the Blanks 1 Marks May-2017 • PSBTE DIPLOMA
-
May 2018
The attendance of the laborers is recorded daily in…………………..
-
Dec 2018
The Attendance of Laborers’ is recorded daily in _______.
-
-
The loss in the value of the property due to structural deterioration is called __________.Fill in the Blanks 1 Marks May-2017 • PSBTE DIPLOMA
-
May 2022 The loss in the value of property due to structural deterioration is called __________.
-
Dec 2018
The Loss in the value of Property due to structural deterioration is called ________.
-
-
The amount submitted by contractor as a guarantee of tender is called __________.Fill in the Blanks 1 Marks May-2017 • PSBTE DIPLOMA
-
May 2022 The amount submitted by Contractor as the guarantee of Tender is called __________.
-
Dec 2018
The Amount submitted by Contractor as the guarantee of Tender is called ________.
-
-
Number of bricks required for 1 cu.m brick masonry is __________.Fill in the Blanks 1 Marks May-2017 • PSBTE DIPLOMA
-
May 2022 How many bricks are required for 1 cu.m Brick Masonry?
-
May 2019 Number of bricks required for 1 Cu.m brick masonry is ______.
-
Dec 2018
Fill in the blanks.
\r\n\r\ni. No. of bricks for 1 cu.m Brick Masonry is ________.
-
Dec 2017 No. of bricks in 1 cum of brick masonry is __________
-
May 2015 Number of bricks required for 1 cu.m brick masonry is _________.
-
Dec 2015 Number of bricks required for 1 cum. brick masonry is __________.
-
-
One bag of cement = __________ kg.Fill in the Blanks 1 Marks May-2017 • PSBTE DIPLOMA
-
May 2022 One Bag of Cement = _______ kg
-
Dec 2018
One Bag of Cement = _______ cu.m
-
Dec 2015 One bag of cement = __________ Kg.
-
-
State the unit of measurement for white washing.Short Answer 1 Marks May-2017 • PSBTE DIPLOMA
-
State the unit of measurement for wash basin (size specified).Short Answer 1 Marks May-2017 • PSBTE DIPLOMA
-
State the unit of measurement for dado.Short Answer 1 Marks May-2017 • PSBTE DIPLOMA
-
State the unit of measurement for welding.Short Answer 1 Marks May-2017 • PSBTE DIPLOMA
-
May 2019 State the unit of measurement for Welding.
-
Dec 2016 State the Units of Measurement of welding.
-
May 2007 Give the unit of measurement for welding.
-
-
State the unit of measurement for half brick wall.Short Answer 1 Marks May-2017 • PSBTE DIPLOMA
-
Dec 2017 Units of measurement of brick wall is __________
-
May 2016 State the units of measurements and payment for Half brick wall.
-
-
State the unit of measurement for flooring.Short Answer 1 Marks May-2017 • PSBTE DIPLOMA
-
May 2022 State the Units of Measurement for Flooring.
-
May 2019 State the unit of measurement for Flooring.
-
Dec 2017 State the units of measurement for concrete flooring.
-
May 2016 State the units of measurements and payment for Flooring.
-
Dec 2015 State the units of measurements for flooring.
-
-
State the unit of measurement for drain.Short Answer 1 Marks May-2017 • PSBTE DIPLOMA
-
Dec 2016 State the Units of Measurement of drain.
-
Dec 2015 State the units of measurements for drain.
-
-
State the unit of measurement for steel work.Short Answer 1 Marks May-2017 • PSBTE DIPLOMA
-
May 2022 State the unit of measurement for Steel work.
-
May 2019 State the unit of measurement for Steel work.
-
May 2016 State the units of measurements and payment for Steel.
-
May 2015 State the unit of measurement for Steelwork.
-
Dec 2015 State the units of measurements for steel work.
-
May 2007 Give the unit of measurement for steel work.
-
-
State the unit of measurement for glass panes.Short Answer 1 Marks May-2017 • PSBTE DIPLOMA
-
May 2015 State the unit of measurement for Glass Panes.
-
May 2007 Give the unit of measurement for glass panes supply.
-
-
State the unit of measurement for supply of timber.Short Answer 1 Marks May-2017 • PSBTE DIPLOMA
-
May 2008 Give the unit of measurement and unit of payment for supply of timber.
-
Dec 2008 Write the units of measurement and payment for sawing of timber.
-
May 2007 Give the unit of measurement for sawing of timber.
-
-
Find out the dry material for 1 cu.m brick masonry in cement sand mortar 1:5.Short Answer 5 Marks May-2017 • PSBTE DIPLOMA
-
May 2022 Find out the Dry Materials required for 1 cu.m Brick Masonry in Cement Mortar 1:5 in Foundation.
-
May 2022 Find dry materials required for 5m³ brick masonry in cement mortar 1:4.
-
May 2020 Find out the Dry Materials required for 1 cu.m Brick Masonry in Cement Mortar 1:5.
-
May 2019 Find out the dry material for 1 cu.m brick masonry in cement sand mortar 1:5.
-
May 2018
Find out the dry material for 1cu.m brick masonry in cement sand mortar 1:4.
-
May 2015 Find out the dry material for 100 cu.m brick masonry in cement sand mortar 1:5.
-
Dec 2015 Find out dry material required for 1 cum. brick masonry in cement mortar 1:5.
-
-
Define an estimate. Give its importance or objectives. Name the various types of estimate.Long Answer 5 Marks May-2017 • PSBTE DIPLOMA
-
May 2019 Define an estimate. Give its importance or objectives. Name the various types of estimate.
-
May 2015 Define an estimate. Give its importance or objectives. Name the various types of estimate.
-
-
Write a note on analyses of rates.Short Answer 5 Marks May-2017 • PSBTE DIPLOMA
-
May 2016 Write short note on Analysis of rates.
-
May 2015 Write a note on analysis of rates.
-
May 2010 Write a note on the steps involved in the analysis of rates.
-
-
Find out the dry material required for 1 cu.m cement concrete 1:2:4.Short Answer 5 Marks May-2017 • PSBTE DIPLOMA
-
May 2022 Find out the Dry Materials required for 1 cu.m Cement Concrete 1:1.5:3.
-
May 2020 Find out the Dry Materials required for 1 cu.m Cement Concrete 1:2:4.
-
May 2019 Find out the dry material required for 1 cu.m cement concrete 1:2:4.
-
May 2018
Find out the dry material required for 1cu.m cement concrete 1:4:8
-
Dec 2018
Find out the Dry Materials required for 1 cu.m Cement Concrete 1:2:4
-
Dec 2017 Find out the dry material required for 10 cum cement concrete 1:2:4.
-
May 2015 Dry material required for 1 cu.m cement concrete is _________ cu.m.
-
May 2015 Find out the dry material required for 100 cu.m cement concrete 1:2:4.
-
-
What do you mean by tender?Short Answer 5 Marks May-2017 • PSBTE DIPLOMA
-
May 2022 What do you mean by tender?
-
-
Distinguish clearly between preliminary estimate and detailed estimate.Long Answer 5 Marks May-2017 • PSBTE DIPLOMA
-
May 2015 Distinguish clearly between preliminary estimate and detailed estimate.
-
May 2007 Differentiate between preliminary estimate and detailed estimate.
-
-
Explain the principles of valuation.Long Answer 5 Marks May-2017 • PSBTE DIPLOMA
-
Dec 2018
Explain in detail the various methods of Valuation
-
May 2015 Explain the principles of valuation.
-
-
Define contractor. What are essential qualifications of a contractor?Long Answer 5 Marks May-2017 • PSBTE DIPLOMA
-
May 2022 What are the qualities and responsibilities of contractor?
-
May 2019 Define contractor. What are essential qualifications of a contractor?
-
May 2015 Define contractor. What are the essential qualifications of a contractor?
-
Dec 2015 What is contractor?
-
-
Write a short note on depreciation of buildings.Short Answer 5 Marks May-2017 • PSBTE DIPLOMA
-
May 2020 Write a short note on Depreciation of Buildings and different types of Building Estimates.
-
May 2019 Write a short note on Depreciation and Muster Roll.
-
Dec 2018
Write a short note on Depreciation of Buildings and different types of Building Estimates.
-
Dec 2017 Write a short note on depreciation.
-
May 2016 Write short note on Depreciation.
-
May 2015 Write a short note on depreciation of buildings.
-
-
Prepare a preliminary estimate of a building having plinth area equal to 2000 sq.m. Given that plinth area rate is Rs. 2100/- per sq. m; extra for architectural work is 1.5% of the building cost; extra for electrical installation (10%) and water supply and sanitary installations (6%) = 16% of the building cost; extra for other services is 8% of the building cost; contingencies and supervision charges are 10%.Long Answer 10 Marks May-2017 • PSBTE DIPLOMA
-
May 2019 Prepare a preliminary estimate of a building having plinth area equal to 2000 sq.m. Given that: Plinth area rate – Rs. 2500/- per sq.; Extra for Architectural work - 1½% of the building cost; Extra for Electrical Installation (10%) + Water supply and sanitary installations (6%) = 16% of the building cost; Extra for other services - 8% of the building cost; Contingencies and supervision charges 10%.
-
May 2015 Prepare a preliminary estimate of a building having plinth area equal to 1600 sq.m. Given that plinth area rate is Rs. 2000/- per sq.m; extra for architectural work is 1.5% of the building cost; extra for electrical installation (10%) plus water supply and sanitary installations (6%) = 16% of the building cost; extra for other services is 8% of the building cost; contingencies and supervision charges are 10%.
-
-
Work out the analyses of rates for cement concrete 1:4:8 in foundation. Labour for 10 cu.m cement concrete is 1 mason @ Rs. 450/- per day, 15 mazdoor @ Rs. 250/- per day, 2 bhisti @ Rs. 200/- per day. Rate of material: cement bag Rs. 300/-, sand Rs. 800/- per cu.m, coarse aggregate (bazri) Rs. 1000/- per cu.m.Long Answer 10 Marks May-2017 • PSBTE DIPLOMA
-
May 2022 Work out the analyses of rate for cement concrete 1:2:4 in slab. Labour for 10m³ cement concrete is 1 mason @ 450 Rs/day, 15 mazdoor @ 300 Rs/day, 2 Bhisti @ 200 Rs/day. Rate of material: cement bag Rs. 390/-, sand Rs. 850/- per m³. (Assume any missing data)
-
May 2020 Prepare the Analysis of Rate for 10 cu.m of Cement Concrete 1:2:4 from the following data: Labour for 10 cu.m Mason: 1 no. @ Rs. 300 per day; Labour: 15 no. @ Rs. 200 per day; Water Man: 2 no. @ Rs. 250 per day. Cost of Material Cement: Rs. 300 per Bag; Sand: Rs. 600 per cu.m; Bajri: Rs. 1200 per cu.m.
-
Dec 2018
Prepare the Analysis of Rate for 10 cu.m of Cement Concrete 1:2:4 from the following data:
\r\n\r\nLabour for 10 cu.m : Mason: 1 no. @Rs. 300 per day
\r\n\r\nLabour: 15 no. @Rs. 200 per day
\r\n\r\nWater Man: 2 no. @ Rs. 250 per day
\r\n\r\nCost of Material Cement: Rs. 300 per Bag
\r\n\r\nSand: Rs. 600 per cu.m
\r\n\r\nBajri: Rs. 1200 per cu.m.
-
May 2016 Prepare the analysis of rate for 10 cum of cement concrete 1:2:4 from the given data: labour for 10 cum; Mason = 1 @ Rs. 300 per day, Labour = 15 @ Rs. 200 per day, Water man = 2 @ Rs. 250 per day. Cost of material: Cement = Rs. 300 per bag, Sand = Rs. 600 per cum, Bajri = Rs. 1200 per cum.
-
Dec 2016 Work out the analyses of rate for cement concrete 1:2:4 in slab. Labour for 10 cum cement concrete is 1 mason @ 450 Rs/day, 15 mazdoor @ 300 Rs/day, 2 bhisti @ 200 Rs/day. (Assume any other required data).
-
May 2015 Work out the analysis of rates for cement concrete 1:4:8 in foundation. Labour for 10 cu.m cement concrete is 1 mason @ Rs. 500/- per day, 15 mazdor @ Rs. 300/- per day, 2 bhisti @ Rs. 250/- per day. Rate of material: cement bag Rs. 250/-, sand Rs. 600/- per cu.m, course aggregate (bazri) Rs. 1000/- per cu.m.
-
-
Define valuation. Give the purpose of valuation. State and explain the various methods of valuation.Long Answer 10 Marks May-2017 • PSBTE DIPLOMA
-
May 2022 What is Valuation? Write down the purpose of Valuation.
-
May 2020 What is Valuation? Write down the purpose of Valuation.
-
May 2019 What is valuation? Give the purpose of valuation.
-
May 2018
Define valuation. Give the purpose of valuation
-
Dec 2018
What is Valuation? Write down the purpose of Valuation.
-
May 2016 Write short note on Purpose of valuation.
-
Dec 2016 What is valuation? Give the purpose of valuation.
-
May 2015 Define valuation. Give the purpose of valuation. State and explain the various methods of valuation.
-
Dec 2015 What is valuation?
-
Dec 2015 Write down the purpose of valuation.
-
May 2010 Explain the purpose of valuation.
-
Dec 2008 Define valuation and explain purpose of valuation.
-
May 2007 What is the purpose of valuation?
-
-
What is contract? Explain the different type of contract.Long Answer 10 Marks May-2017 • PSBTE DIPLOMA
-
May 2022 Explain different types of Contracts.
-
May 2022 What is meaning of Contract? Explain.
-
May 2020 Define Contract and explain it’s different types.
-
May 2019 What is contract? Explain the different type of contract.
-
May 2018
Define Contract? What are the essential elements of contracts?
-
Dec 2018
Define Contract and explain its different types
-
Dec 2017 What is contract? Explain different types of contract.
-
May 2015 What is contract? Explain the different types of contract.
-
Dec 2015 Define contract and explain different types of contracts.
-
May 2010 What is a contract? Explain its basic elements.
-
-
Work out the cost of earth work for a portion of a road from Rd 0 to Rd 90 meters from the following data: Rd 0, 30, 60, 90; N.S. levels 205.00, 205.60, 206.10, 206.90; formation in a downward gradient of 1 in 30; formation width 10 meters; side slope 2:1 (horizontal: vertical); rate of earthwork Rs. 425.00 per cu.m.Long Answer 10 Marks May-2017 • PSBTE DIPLOMA
-
May 2019 Work out the cost of earth work for a portion of a road from Rd 0 to Rd 90 meters from the following data: Rd, N.S. level, Formation level: 0 - 205.00 - 210.00; 30 - 205.60 - ; 60 - 206.00 - ; 90 - 206.80 - ; The formation is in a downward gradient of 1 in 30. Formation width is 10 meters and side slope 2:1 (Horizontal: Vertical). Rate of earthwork is Rs. 400.00% cu.m.
-
May 2015 Work out the cost of earth work for a portion of a road from Rd 0 to Rd 90 meters from the following data: Rd 0 = 205.00, Rd 30 = 205.00, Rd 60 = 206.00, Rd 90 = 206.00, filling or banking level = 210.00. The formation is in a downward gradient of 1 in 30. Formation width is 10 meters and side slope is 2:1 (Horizontal:Vertical). Rate of earthwork is Rs. 400.00 per cu.m.
-
-
Work out the quantity of excavation for foundation from the given drawing.Comprehension 10 Marks May-2017 • PSBTE DIPLOMA
-
May 2022 Work out the Quantities of Excavation for Foundation from the given Drawing (Wall thickness-0.30 m all around).
-
May 2016 Calculate the quantities of excavation for foundation from the sketch attached.
-
Dec 2016 Work out the quantities of excavation for foundation from the given drawing.
-
May 2015 Work out the quantity of excavation for foundation from the given drawing.
-
-
Work out the quantity of cement concrete 1:6:18 in foundation from the given drawing.Comprehension 10 Marks May-2017 • PSBTE DIPLOMA
-
May 2022 Work out the Quantities of P.C.C in Foundation (1:6:18) from the given Drawing (Wall thickness-0.30 m all around).
-
Dec 2016 Work out the quantities of cement concrete 1:6:18 in foundation from the given drawing.
-
May 2015 Work out the quantity of cement concrete 1:6:18 in foundation from the given drawing.
-
-
Work out the quantity of mud masonry in foundation and plinth from the given drawing.Comprehension 10 Marks May-2017 • PSBTE DIPLOMA
-
May 2022 Work out the Quantities of Mud Masonry in Foundation and Plinth from the given Drawing (Wall thickness-0.30 m all around).
-
Dec 2016 Work out the quantities of brick masonry in foundation and plinth from the given drawing.
-
May 2015 Work out the quantity of mud masonry in foundation and plinth from the given drawing.
-
Dec 2008 Work out the quantities of excavation for foundation for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of lime concrete in foundation for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of mud masonry in foundation and plinth for a room as shown in Figure 1.
-
Dec 2008 Work out the quantities of mud masonry in super structure for a room as shown in Figure 1.
-
May 2007 Work out quantities of excavation for foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of CC in foundation for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of brick work in foundation and plinth in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
May 2007 Work out quantities of brick work in super structure in cement mortar for a two roomed quarter as per drawing given in figure-1 (overleaf).
-
-
Work out the quantity of mud masonry in super structure from the given drawing.Comprehension 10 Marks May-2017 • PSBTE DIPLOMA
-
May 2022 Work out the Quantities of Mud Masonry in Superstructure from the given Drawing (Wall thickness-0.30 m all around).
-
May 2015 Work out the quantity of mud masonry in super structure from the given drawing.
-
Explore all data
FAQ
Frequently Asked Questions
Answers about this subject, solved papers, and preparation.
01 Where can I find QSV previous year question papers for Civil Engineering 6th semester?
You can use this page to look for QSV old question papers and previous year papers for PSBTE Diploma in Civil Engineering 6th semester.
02 Is this page for Quantity Surveying and Valuation only?
Yes, this page is focused on QSV, which stands for Quantity Surveying and Valuation, for the 6th semester Civil Engineering course.
03 Can I use these papers for revision before exams?
Yes, previous year papers are helpful for revision, practicing questions, and understanding the exam pattern for QSV.
04 Are these official question papers from PSBTE?
No, BRpaper is not the official website of Punjab State Board of Technical Education. It only helps students find previous year papers and related study material.
05 Do you provide solved QSV question papers?
Some question papers may be available for practice, but this page does not guarantee solved papers for every year.