QSV (Quantity Surveying and Valuation) for Punjab State Board of Technical Education Diploma in Engineering Civil Engineering 6th semester helps students find subject-wise previous year question papers, old papers, and exam preparation material. These papers are useful for revision, understanding the exam pattern, and spotting repeated question styles before the exam. BRpaper is not the official website of the Punjab State Board of Technical Education or any board or university. Use this page to explore QSV question paper PDFs and old exam papers for better practice and preparation.

Solved Questions

Solved
  1. State the unit of measurement for Painting.
    Very Short Answer 1 Marks May-2022 • PSBTE DIPLOMA
  2. State the unit of measurement for Brick Work.
    Very Short Answer 1 Marks May-2022 • PSBTE DIPLOMA
  3. State the unit of measurement for Pointing.
    Very Short Answer 1 Marks May-2022 • PSBTE DIPLOMA
  4. State the unit of measurement for Cement Plaster.
    Very Short Answer 1 Marks May-2022 • PSBTE DIPLOMA
  5. State the unit of measurement for Cement Plaster.
    Very Short Answer 1 Marks May-2022 • PSBTE DIPLOMA
  6. State the unit of measurement for Steel work.
    Very Short Answer 1 Marks May-2022 • PSBTE DIPLOMA
  7. The attendance of the __________ is recorded daily in Muster Roll.
    Fill in the Blanks 1 Marks May-2022 • PSBTE DIPLOMA
  8. Total Dry material required for 1m³ cement concrete is ________ m³.
    Fill in the Blanks 1 Marks May-2022 • PSBTE DIPLOMA
  9. The loss in the value of property due to structural deterioration is called __________.
    Fill in the Blanks 1 Marks May-2022 • PSBTE DIPLOMA
  10. The amount submitted by Contractor as the guarantee of Tender is called __________.
    Fill in the Blanks 1 Marks May-2022 • PSBTE DIPLOMA
  11. One Bag of Cement = _______ kg
    Fill in the Blanks 1 Marks May-2022 • PSBTE DIPLOMA
  12. A reasonable profit usually 15% for contractor is included in the analysis of rates.
    True / False 1 Marks May-2022 • PSBTE DIPLOMA
  13. Capitalized value = net annual rent × Year’s Purchase
    True / False 1 Marks May-2022 • PSBTE DIPLOMA
  14. On acceptance of the tender 20% of the tendered amount must be paid as security money.
    True / False 1 Marks May-2022 • PSBTE DIPLOMA
  15. While estimating for plastering, usually no deduction is made for ends of beams.
    True / False 1 Marks May-2022 • PSBTE DIPLOMA
  16. Detailed estimate is expected to be least accurate.
    True / False 1 Marks May-2022 • PSBTE DIPLOMA
  17. What are the duties of Quantity Surveyor?
    Short Answer 5 Marks May-2022 • PSBTE DIPLOMA
  18. Write short note on Detailed Estimate.
    Short Answer 5 Marks May-2022 • PSBTE DIPLOMA
  19. Briefly explain Centre Line Method of building estimate.
    Short Answer 5 Marks May-2022 • PSBTE DIPLOMA
  20. What is Balancing Depth?
    Short Answer 5 Marks May-2022 • PSBTE DIPLOMA
  21. What do you mean by tender?
    Short Answer 5 Marks May-2022 • PSBTE DIPLOMA
  22. What is meaning of Contract? Explain.
    Short Answer 5 Marks May-2022 • PSBTE DIPLOMA
  23. What is Common Schedule of Rates?
    Short Answer 5 Marks May-2022 • PSBTE DIPLOMA
  24. What is Comparative Statement?
    Short Answer 5 Marks May-2022 • PSBTE DIPLOMA
  25. Explain the term Depreciation.
    Short Answer 5 Marks May-2022 • PSBTE DIPLOMA
  26. A short link road is to be constructed entirely in cutting at a uniform rising gradient 1 in 30. The natural surface levels are given below: R.D. 0 30 60 90 120 150; N.S. level 71.4 70.7 72.6 74.05 75.4 74. If the formation level at Rd 0 is 72.5 meters, estimate the quantity of cutting for a formation width of 10 meters. The side slope is 2:1 (Horizontal: vertical) and there is no cross slope. Also find out the cost of cutting @ Rs.500.00 per m³.
    Comprehension 10 Marks May-2022 • PSBTE DIPLOMA
  27. Find dry materials required for 5m³ brick masonry in cement mortar 1:4.
    Short Answer 10 Marks May-2022 • PSBTE DIPLOMA
  28. Work out the analyses of rate for cement concrete 1:2:4 in slab. Labour for 10m³ cement concrete is 1 mason @ 450 Rs/day, 15 mazdoor @ 300 Rs/day, 2 Bhisti @ 200 Rs/day. Rate of material: cement bag Rs. 390/-, sand Rs. 850/- per m³. (Assume any missing data)
    Long Answer 10 Marks May-2022 • PSBTE DIPLOMA
  29. What are the qualities and responsibilities of contractor?
    Short Answer 10 Marks May-2022 • PSBTE DIPLOMA
  30. Work out the quantity of following items from the given drawing: a. Excavation for foundation b. Cement concrete 1:6:18 in foundation c. Brick masonry in cement mortar 1:7 in foundation and plinth d. Brick masonry in 1:5 super structures.
    Comprehension 10 Marks May-2022 • PSBTE DIPLOMA

Explore all data

FAQ

Frequently Asked Questions

Answers about this subject, solved papers, and preparation.

Updated regularly
01 Where can I find QSV previous year question papers for Civil Engineering 6th semester?

You can use this page to look for QSV old question papers and previous year papers for PSBTE Diploma in Civil Engineering 6th semester.

02 Is this page for Quantity Surveying and Valuation only?

Yes, this page is focused on QSV, which stands for Quantity Surveying and Valuation, for the 6th semester Civil Engineering course.

03 Can I use these papers for revision before exams?

Yes, previous year papers are helpful for revision, practicing questions, and understanding the exam pattern for QSV.

04 Are these official question papers from PSBTE?

No, BRpaper is not the official website of Punjab State Board of Technical Education. It only helps students find previous year papers and related study material.

05 Do you provide solved QSV question papers?

Some question papers may be available for practice, but this page does not guarantee solved papers for every year.